Hawthorne Bridge Connections RFP
Closed State & local contract opportunity Posted
- Solicitation number
- 27-3209
- State
- Oregon
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 90607 Architect Services, Professional
- 90610 Buildings - Architectural Design
- 90625 Design Build Services
- 90638 General Construction - Architectural
- 90640 Graphic Design - Architectural
- 90740 Engineering Services, Non-Licensed (Not Otherwise Classified)
- 925 Engineering Services, Professional
- 92517 Civil Engineering
- UNSPSC codes
- 81103402 Front-end engineering design services
- 81103403 Detailed engineering services
- 81103405 Onshore engineering procurement and construction services
- 81103300 Geomatics engineering
- 81101500 Civil engineering
- 81103400 Engineering procurement and project management services
- 81103404 Offshore engineering procurement and construction services
Opportunity details come from bendoregon.bonfirehub.com. Updated .
About this opportunity
Deschutes County is requesting proposals for design services on the Hawthorne Bridge Connections project, advancing concept design to construction documents for safety, connectivity, and multimodal improvements, with proposals due October 2, 2026.
The scope encompasses design of safety and connectivity improvements along Hawthorne Avenue from the Hawthorne Bridge Overcrossing terminus to Bend Bikeway at Juniper Park and Franklin Avenue. Design deliverables include a traffic signal at 3rd Street and continuation of protected shared-use path facilities coordinated with the overcrossing project. The design contract is funded through the 2020 GO Bond with an allocated budget of approximately $930,000. The estimated construction phase budget is $6 million. Detailed scope of work is provided in Exhibit A.
Opportunity text
The project will include advancing concept design to construction documents for safety, connectivity and multimodal improvements from the terminus of the Hawthorne Bridge Overcrossing, along Hawthorne Avenue, to Bend Bikeway at Juniper Park and Franklin Avenue, respectively. Design improvements will include a signal at 3rd Street and a continuation of the protected shared use path facilities to be constructed with the overcrossing project. The total design phase budget currently allocated through the 2020 GO Bond is approximately $930,000. The estimated construction phase budget is $6,000,000. Detailed information regarding the services to be provided can be found in Exhibit A - Scope of Work.