Hartrick Bluff Reconstruction (From FM 93 to Waters Dairy Rd) FM 93 IMP & Traffic Signalization
Closed State & local contract opportunity Posted
- Solicitation number
- Bid #34-06-26
- State
- Texas
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Purchasing Department purchasing@templetx.gov (254) 298-5655
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of Temple, Texas is requesting bids on the Hartrick Bluff Reconstruction project (Bid #34-06-26), a three-part roadway, utilities, and traffic signalization improvement under ITB, with bids due June 16, 2026 at 2:30 p.m. CST via the Euna Procurement online portal or hard copy submission.
The scope spans approximately 6,200 linear feet of 40-foot-wide, two-lane roadway with center turn lane, sidewalks, a precast bridge structure, and 7,660 linear feet of waterline (8-inch, 10-inch, and 12-inch); roadway signalization; lane widening; and designated turn lanes at F.M. 93. The project is divided into three parts: Part A (Roadway and Drainage, 79 line items), Part B (Utilities, 34 line items), and Part C (F.M. 93 Improvements and Traffic Signalization, 88 line items). The contractor must comply with prevailing wage rates established by the City and is subject to liquidated damages for completion exceeding 730 consecutive calendar days from Notice to Proceed. The contractor must maintain a local representative available throughout the contract term and is responsible for Immigration Reform and Control Act compliance, all required permits, and all specified insurance with the City named as additional insured.
The engineer's estimate of probable project cost is $13,563,786.07. This is a unit price contract with payment based on actual quantities. Bidders must submit a 5% bid bond, Bond Requirement Affidavit, Bidder Information Form, completed pricing sheets, and a Conflict of Interest Questionnaire if applicable. The successful bidder will furnish performance and payment bonds each in the amount of 100% of the total contract price per Texas Government Code Chapter 2253, Subchapter B. Contract award is expected in July 2026. The non-mandatory pre-bid conference was held May 19, 2026. Questions are due June 9, 2026 at 12:00 p.m. CST. Virtual bid opening occurs immediately after submission deadline.
Opportunity text
The project consists of constructing approximately 6,200 linear feet of 40-foot-wide, two-lane roadway with a center turn lane, including sidewalks, a precast bridge structure, and 7,660 linear feet of 8-inch, 10-inch, and 12-inch waterline. The scope also includes roadway signalization, lane widening, and the addition of designated turn lanes at F.M. 93.
Files
| File | Type | Posted |
|---|---|---|
| 01 ITB - Hartrick Bluff Reconstruction Traffic Signalization 34-06-26.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity