Harness Road Bridge Replacement

Closed State & local contract opportunity Posted

Solicitation number
BRO-R050(002)
State
Missouri
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

Jefferson County Department of Public Works in Missouri is requesting qualifications from a consulting engineering firm for professional services on the Harness Road Bridge Replacement project, with Letters of Interest due September 25, 2026. The project involves a bridge replacement over Plattin Creek with an estimated construction cost of $2.4 million and is funded through the Surface Transportation Block Grant Program.

The scope encompasses preliminary plans, right-of-way and easement plats, final construction plans, technical specifications, and construction cost estimation. The consultant may perform field surveys, archaeological studies, environmental studies, and geotechnical investigations. Limited construction engineering services include site inspections, project management, review of shop drawings and material certifications, drawing revisions, staking of new right-of-way corners, setting of pins post-construction, and responses to requests for information from the contractor and county.

Consultants must submit a Statement of Qualifications in compliance with RSMO 8.285 through 8.291, an Affidavit of Compliance with the federal work authorization program, and a copy of the company's E-Verify Memorandum of Understanding prior to or with the LOI. The LOI must not exceed four pages and include information on the assigned team members, their backgrounds, and relevant recently completed or active projects of similar scope. Five copies of the LOI must be delivered to 725 Maple Street, Room 104, Hillsboro, Missouri 63050 (or PO Box 100, Hillsboro, MO 63050) by 4:00 p.m. on September 25.

The selection committee will evaluate proposals under Brooks Act criteria, scoring across three categories: Experience and Technical Competence of the Project Team (30 points maximum), Capacity and Capability of Firm to Complete the Project (30 points maximum), and Past Record of Performance on Similar Projects (40 points maximum). No project briefing meetings will be held during the RFQ process; all questions must be submitted in writing to Kurt Wengert, P.E., Technical Division Manager.

Opportunity text

The Jefferson County Department of Public Works is requesting the services of a consulting engineering firm to perform the professional services described for the project included on the attached list. If your firm would like to be considered for these consulting services, you may express your interest by responding to the appropriate office which is indicated on the attachment. Limit your Letter of Interest (LOI) to no more than four (4) pages. This LOI should include any information which might help us in the selection process, such as the persons or team you would assign to the project, the backgrounds of those individuals, and other projects your company has recently completed, or are now active, that are similar in scope. Consultant shall be responsible for professional engineering services including the preparation of preliminary plans, right-of-way and easement plats, final construction plans, technical specifications and construction cost estimation. As part of preparing the plans the consultant may need to perform field surveys, and archaeological or environmental studies. The consultant shall also be responsible for a limited number of construction engineering services including; site inspections, project management, review of shop drawings and material certifications, perform any needed drawing revisions and respond to requests for information from both the Contractor and the County.

Files

File Type Posted
Harness Road Bridge Replacement.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity