Hampton and St. Clair Bridge Concrete Floor Install Project
Awarded State & local contract opportunity Posted
- Solicitation number
- IFB605SL20001525
- State
- Missouri
- Responses due
Opportunity facts
- Jurisdictions
- Point of contact
-
- Stephanie Austin Rashid stephanie.austinrashid@modot.mo.gov (314) 205-7307
Opportunity details come from webprocure.proactiscloud.com. Updated .
About this opportunity
The Missouri Department of Transportation (MoDOT) has issued an Invitation for Bid (IFB605SL20001525) for a concrete floor installation project at two bridge maintenance buildings: the Hampton Bridge location (6138 Wilson Ave., St. Louis, MO 63139) and the St. Clair Bridge location (2273 N. Service Rd E, St. Clair, MO 63077). The procurement seeks qualified vendors to install concrete floors at both maintenance buildings, with both locations required to be completed within 20 working days after the Notice to Proceed is issued. The project will be awarded on an "All or Nothing" basis using the "lowest and best" bid principle, with bids due by January 23, 2020 at 10:00 AM CST. Interested vendors must schedule a mandatory site visit by contacting Allen Lane at (314) 581-0137. Pricing must be submitted as two separate lump sum items: one for the Hampton Bridge Concrete Floor Installation and another for the St. Clair Bridge Concrete Floor Installation. Vendors must provide documentation of their ability to complete the work, including proof of insurance coverage including commercial general liability ($500,000 per person/$3,000,000 per occurrence) and automobile liability insurance with similar limits.
The solicitation encourages participation from Minority Business Enterprises (MBE) and Women Business Enterprises (WBE), with specific goals of 10% MBE and 5% WBE participation through subcontractors, suppliers, joint ventures, or other arrangements. Service-Disabled Veteran (SDV) businesses are also eligible for preferences. Successful bidders must comply with the Missouri Department of Labor's Construction Safety Program requirements and will be subject to liquidated damages of $100 per day per item for late completion. Payment terms are Net 30 days, and pricing must remain valid for 90 days from the bid opening. While no specific award value or budget range is explicitly stated in the documents, the project involves concrete floor installations at two separate bridge maintenance buildings. Vendors are required to identify any domestic products that are not manufactured or produced in the United States and will receive preference for domestically produced materials. The contract will be funded by the State of Missouri, with bids to be submitted either electronically through the MissouriBUYS Statewide eProcurement System or as hard copies to the specified contact address.
Opportunity text
This solicitation seeks bids from qualified vendors to install a concrete floor in the Hampton Bridge and St. Clair Bridge Maintenance Buildings. Please contact Allen Lane at (314) 581-0137 to schedule a site visit.
Files
Show all 35
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity