About this opportunity
Monroe County, Florida, through its Board of County Commissioners, is soliciting proposals for a habitat restoration project on county conservation lands in Hibiscus Park, Key Largo, with a mandatory pre-bid meeting on December 2, 2026 and proposals due December 29, 2026 at 3:00 p.m. Local preference scores 4 points for respondents with a principal place of business in Monroe County under Ordinance 023-2009, so it adds weight to the evaluation without restricting eligibility.
The scope covers removing approximately 5,522 cubic yards of unauthorized fill, removing 252 cubic yards of boulder revetment, installing approximately 39 cubic yards of 24-inch boulders, and removing an approximately 90-square-foot wood dock. The contractor supplies materials and must comply with Florida Department of Environmental Protection Permit No. 44-0468607-001-EI and US Army Corps of Engineers authorization SAJ-2024-04546 (NWP-MIB), except for specified post-restoration monitoring conditions the county retains. The contractor must obtain a Monroe County Building Department permit before work begins. Excavated fill goes to the Carysfort Basin disposal site within Pennekamp State Park, which requires a contractor's license or specialty hauler license and compliance with State Park Specialty Hauler Guidelines. Equipment entering from outside Monroe County must be decontaminated, and an English-speaking ground crew supervisor must be on site.
Required insurance includes workers' compensation and employer's liability at $100,000 per accident and $500,000 per disease, vehicle liability at $300,000 combined single limit, and general liability at $500,000 combined single limit. Respondents must submit licensing evidence and county forms, including non-collusion, ethics, drug-free workplace, and foreign entities affidavits. No bid, payment, or performance bond is required, and the contract carries no liquidated damages. All work must be complete by June 1, 2027.
Evaluation totals 59 points: price (20), general performance and project approach (20), references (5), respondent background (5), county forms and licenses (5), local preference (4), and claims and litigation history (-5 to 0). Award goes to the highest-ranked responsive, responsible, and conforming respondent. Proposals are submitted electronically through the Bonfire platform, with a virtual bid opening via Zoom on December 29, 2026. The pre-bid meeting takes place at 10:00 a.m. at the east end of Hibiscus Lane, mile marker 101.
Opportunity text
PROJECT DESCRIPTION The purpose of the proposed project is to restore Monroe County conservation lands to their natural state by removing unauthorized fill, boulder revetments, and a wood dock. The work is detailed in the attached engineered drawings by Campbell Engineering (dated April 14, 2026), attached as Attachment 1. All work must comply with the requirements of Florida Department of Environmental Protections Permit No. 44-0468607-001-EI, attached as Attachment 2, and the US Army Corps of Engineers authorization SAJ-2024-04546 (NWP-MIB), attached as Attachment 3. The Contractor is responsible for supply of materials and all work associated with compliance of the permit conditions included in these two permits, with the exception of FDEP permit specific conditions # 23-25 and ACOE project specific special condition #10 which are related to monitoring and maintenance of the site after restoration work has been completed, these listed specific conditions shall be the responsibility of the County. All other conditions of permits/authorizations shall be the responsibility of the Contractor. Contractor is also responsible for obtaining a permit from Monroe County Building Department prior to the start of the work. All fill excavated from the site is to be immediately loaded onto trucks and transported by the Contractor to the fill disposal site located at Carysfort Basin within Pennekamp State Park. Contractor must comply with all State Park requirements, including those listed in the State Parks Specialty Hauler Guidelines included in Attachment 4. Contractor must coordinate access to the disposal site with State Park personnel; County will provide Contractor with Park personnel contact information. To utilize the specified disposal site, Contractor must present a contractors license or specialty haulers license. Fill shall be excavated down to the natural substrate, approximately matching the surrounding natural elevations. Land Steward shall determine when fill removal is complete. Boulders shall remain on site, some of which will be used to stabilize remaining fill on neighboring property as shown on the permit drawings. Any surplus boulders remaining at the end of the project shall be neatly piled by the Contractor within an on-site area designated by the Land Steward. Contractor may not take any fill or boulders off-site for their own purposes. All boulders are to remain on the County site and all fill is to be disposed of as described above. Additionally, Contractor shall remove all portions (above and below water) of an approximately 90 sq ft wood dock as shown on the attached drawings. Contractor is responsible for removal and disposal of entire dock. All work must be completed using land-based equipment. Work must be scheduled in coordination with the Land Steward and must be performed during normal work hours (between 8:00 am and 5:00 pm), Monday through Friday. Weekday work hours may be extended if mutually agreed upon by all parties (Land Steward and Contractor). No work may occur during weekends or on holidays observed by Monroe County. This site is located within a neighborhood and close to a County park. All Contractor vehicles must use caution while accessing the site and must comply with the posted speed limit of 25 mph on Hibiscus Lane. Speeding or reckless driving will not be tolerated and any drivers exhibiting this behavior will be asked to leave the project. Contractor must not disturb existing native vegetation or wetlands on the site. Prior to the start of the project, Contractor shall install construction/silt fencing to delineate the project boundaries in accordance with the permit conditions. Contractor is responsible for maintaining the fencing throughout the project. The Contractor shall at all times provide an on-site ground crew supervisor who is fluent in spoken English as part of the work force, and an on-site party able to translate to crew members if necessary. Ground crew supervisors will be responsible for: 1) coordination with the Monroe County Land Steward staff on a daily / weekly basis; 2) all work activities and safety on project sites; 3) assuring compliance with all permit requirements; 4) assuring that all crews are knowledgeable of and remain within property and project boundaries; 5) avoiding damage to native vegetation and wildlife. To minimize potential introductions of non-native species onto the site, Contractors entering the Keys from areas outside of Monroe County (Keys) must adhere to the following equipment decontamination protocol: Mandatory decontamination protocols must be followed for vehicles and equipment prior to entering the Keys from areas outside of Monroe County (Florida Keys). If decontamination is required by the County, then the contractor must utilize a designated decontamination site within Monroe County. The County shall supply the contractor with a list of designated decontamination sites if necessary.