Groundwater Treatment Plant Filter Gallery Valve Rehabilitation Project - Phase 2
Closed State & local contract opportunity Posted
- Solicitation number
- WD-05-25
- State
- California
- Responses due
Opportunity facts
- Jurisdictions
- Point of contact
-
- Kian Nejad kian.nejad@lbwater.org (562) 570-2319
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The Los Angeles Department of Water and Power is soliciting bids for groundwater treatment plant filter gallery valve rehabilitation (Phase 2), with proposals due October 8, 2026. The work encompasses removal and installation of butterfly valves, electric actuators, steel piping, and Victaulic couplings; rehabilitation of existing steel spools; surface recoating of wash-water piping; electrical conduit, strut, and junction-box reconnection; integration of new actuators with existing SCADA systems; and polyurethane crack injection repair in filter basins. Performance occurs at a Los Angeles County water treatment facility. No set-asides, preferences, evaluation criteria, contract value, timeline detail beyond the proposal due date, or incumbent information is specified in the available source.
Opportunity text
The Work consists of removal and disposal of existing butterfly valves, electric actuators, associated steel piping, Victaulic couplings and appurtenances; installation of new butterfly valves, electric actuators, associated steel piping, Victaulic couplings and appurtenances; rehabilitation of existing steel spools; recoating of existing surface wash water piping; disconnection and reconnection of electrical conduits, struts and junction boxes; connection of new actuators to existing SCADA; and repair of cracks in filter basins with the polyurethane crack injection method.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity