Greeneille Fire House HVAC Upgrade

Closed State & local contract opportunity Posted

Solicitation number
27-33
State
Connecticut
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The City of Norwich, Connecticut, through its Department of Finance/Purchasing, is soliciting proposals under RFP 27-33 for an HVAC upgrade at Greeneville Fire Station 2, 446 N. Main Street, Norwich, with proposals due November 5, 2026 at 2:00 P.M. prevailing time through the City of Norwich Procurement Portal. The pre-bid conference was scheduled for October 23, 2026 at 10:00 A.M. at the project location, with attendance strongly recommended, and that date has passed. The source includes no set-aside or preference program.

The City is open to multiple solutions, including replacement or modification of existing systems, ductless or ducted mini-split heat pump systems, multi-zone systems, conventional HVAC equipment, or a combination. Contractors may submit up to three options: Option A (recommended solution), Option B (mini-split/heat pump solution), and Option C (alternative solution). Each option requires a lump-sum installed price that excludes Connecticut State Sales and Use Tax and associated federal taxes. All equipment must be new and suitable for commercial/public-safety facility use. Proposals must include manufacturer and model numbers, heating and cooling capacity, work scope, exclusions and assumptions, and a project schedule. The contractor must provide a minimum one-year warranty on workmanship and installation after final acceptance.

The contractor must hold all required State of Connecticut licenses and use appropriately licensed subcontractors for electrical, plumbing, roofing, or other specialty work. Required insurance includes Commercial General Liability of $1 million per occurrence and $2 million aggregate, Commercial Automobile Coverage of $1 million combined single limit, and Workers' Compensation under state requirements. Bidders must submit at least three references for comparable commercial or municipal HVAC projects and a Non-Collusion Affidavit.

The station remains operational during construction, so the contractor must coordinate with the Norwich Fire Department to limit disruption to emergency operations. Planned interruptions to heating, cooling, electrical, or other building systems require advance coordination and approval.

The City will award on best value, weighing total project cost, suitability, energy efficiency, reliability, service life, maintenance costs, warranty, contractor qualifications, and overall value. Proposals may be withdrawn within 90 days after opening if no award has been made, or that period may be extended by mutual agreement.

Opportunity text

The intent of this project is to improve the heating and cooling systems serving Greeneville Fire Station 2 and provide a reliable, energy-efficient, and appropriately sized HVAC solution for the facility. The City is open to multiple HVAC solutions. Proposed systems may include replacement or modification of the existing HVAC system, ductless or ducted mini-split heat pump systems, multi-zone systems, conventional HVAC equipment, or a combination of systems. Contractors are encouraged to evaluate the existing facility and recommend a solution that provides the best combination of reliability, energy efficiency, maintainability, occupant comfort, and overall value to the City.

Files

File Type Posted
27-33 Greeneville Fire House HVAC Upgrade.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors