Goers Hill Bridge No. 3 Replacement over White Oak Run
Closed State & local contract opportunity Posted
- Solicitation number
- 67170
- State
- Pennsylvania
- Responses due
Opportunity facts
- Jurisdiction
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The Pennsylvania Department of Transportation is soliciting bids for the replacement of Goers Hill Bridge No. 3 over White Oak Run on State Route 7401 in Archbald Borough, Lackawanna County, with bids due October 1, 2026.
The project involves complete demolition and replacement of an existing concrete-filled I-beam bridge with a composite prestressed concrete spread box beam bridge. The structure spans approximately 868 feet from Station 39+00.00 to Station 48+25.00. The scope includes all demolition, excavation, foundation work, bridge superstructure installation, and roadway restoration. Traffic will be diverted via temporary roadway during construction.
Bidders must comply with applicable Pennsylvania construction standards, prevailing wage requirements, and safety regulations. Award will be made to the lowest qualified responsive bidder meeting all technical and contractual requirements. The project is publicly funded through Pennsylvania state transportation funds and is subject to competitive bidding procedures.
The complete specifications, technical requirements, and contract terms are contained in the attached PennDOT bidding documents. Interested contractors must review specifications in full and attend any required pre-bid conferences or site visits before submitting sealed bids per the outlined timeline and procedures.
Opportunity text
This project is for the replacement of an existing structure on State Route 7401, Section BRG, in Archbald Borough, Lackawanna County, in the Commonwealth of Pennsylvania. The project is located along Goers Hill Street in Archbald Borough at the structure over White Oak Run from Station 39+00.00to Station 48+25.00 with an overall length of 868 feet. The proposed work is a replacement of the existing concrete-filled I-beam bridge with a composite prestressed concrete spread box beam bridge. Traffic will be diverted with a temporary roadway during construction.
Files
| File | Type | Posted |
|---|---|---|
| 840744padot67170.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity