GDOT PI 0021607 N Cherokee Road from Rose Lane to Partee Drive

Closed State & local contract opportunity Posted

Solicitation number
PE-66276-NONST-2026-000000026
State
Georgia
Responses due

Opportunity facts

Point of contact

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

The City of Social Circle, Georgia is soliciting Statements of Qualifications from consultant firms for engineering and design services on a Transportation Alternatives Program project along North Cherokee Road from Rose Lane to Partee Drive, with SOQs due July 23, 2026.

The scope encompasses design and engineering for pedestrian infrastructure improvements: concrete curb and gutter installation, new sidewalk construction, grading and drainage improvements, utility adjustments and relocations, driveway tie-ins, erosion and sedimentation control measures, pavement restoration, ADA-compliant curb ramps, and pedestrian accessibility features at intersections and crossing points. The project is intended to establish a continuous ADA-compliant pedestrian route to improve safety, accessibility, and connectivity in a corridor where existing infrastructure is limited or absent. All work must conform to Transportation Alternatives Program requirements and standards.

The project is federally funded through the Transportation Alternatives Program. The RFQ document (0021607 Walton 2026_06_10 RFQ.docx) contains detailed submittal requirements, evaluation criteria, and contractual terms; interested firms should review the complete documentation for deadline dates and specific qualifications required.

Opportunity text

The City of Social Circle is soliciting Statement of Qualifications (SOQs) from qualified firm(s) or organization(s) to provide consultant services for Engineering and Design for a Transportation Alternative Program (TAP) project. The proposed Transportation Alternatives Program (TAP) project consists of the construction of new curb, gutter, and sidewalk facilities along the west side of North Cherokee Road from Rose Lane to Partee Drive. The project is intended to improve pedestrian safety, accessibility, and connectivity within the corridor by providing a continuous ADA-compliant pedestrian route where existing infrastructure is limited or absent. The scope of work includes the installation of concrete curb and gutter, construction of a new sidewalk, grading and drainage improvements as necessary, utility adjustments and relocations, driveway tie-ins, erosion and sedimentation control measures, pavement restoration, and all associated traffic control and signage required during construction. The project will also include ADA-compliant curb ramps and pedestrian accessibility features at roadway intersections and crossing points.

Files

File Type Posted
0021607 Walton 2026_06_10 RFQ.docx DOCX document

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors