GDC-164A-CxA Autry State Prison Campus Wide Upgrades - Bldg. Commissioning Services
Closed State & local contract opportunity Posted
- Solicitation number
- PE-40900-RFQC-2025-000000115
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
- 81141501 Materials testing
- 81141504 Equipment test calibration or repair
- 81141506 Product testing
- 81141512 Equipment inspection and verification services
- 81000000 Engineering and Research and Technology Based Services
- 81100000 Professional engineering services
- 81101529 Acoustic engineering
- 81101531 Sanitation engineering service
- 81101606 Marine engineering
- 81102702 Process control system design and engineering service
Show all 18
- 81141510 Quality control and quality assurance audit and verification services
- 81102501 Mine permitting service
- 81141502 Materials synthesis
- 81141503 Materials or product inspection
- 81141505 Production standards development
- 81141511 Quality control and quality assurance consultancy services
- 81101607 Textile engineering service
- 81103406 Conceptual Studies and Pre-Front-end engineering design services
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The Georgia State Financing and Investment Commission (GSFIC), on behalf of the Georgia Department of Corrections (GDC), is conducting a two-step Request for Qualifications (RFQ) and Request for Proposals (RFP) for building commissioning services for the Autry State Prison Campus Wide Upgrades project located in Pelham, Mitchell County. The project encompasses comprehensive mechanical system upgrades, construction of a new kitchen facility, dining hall renovations, and potential roof and window replacements at a medium-security prison facility housing approximately 1,698 inmates. Deliverables include developing Owner's Project Requirements (OPR), conducting pre-TAB assessments, reviewing design documents, performing site observations, and verifying testing and balancing work for mechanical, electrical, plumbing, and optional building envelope systems. The procurement requires a Georgia Peach certification with commissioning and will utilize a Construction Manager at Risk (CM/GC) delivery method. Key submission deadlines include RFQ responses due on January 8, 2025, at 2:00 PM, with finalist interviews scheduled for January 28, 2025, and commissioning agent services expected to commence in February 2025.
The solicitation has already shortlisted four firms for consideration: Abbeville Commissioning, Addison Energy Technologies, Setty & Associates International, and Total Systems Commissioning. While no specific set-aside designations or enterprise restrictions are explicitly mentioned, the project demonstrates a comprehensive approach to facility upgrades with a significant budget allocation. The preliminary Stated Cost Limitation (SCL) is $30,000,000, broken down as $18,000,000 for campus-wide mechanical system upgrades, $12,000,000 for the new kitchen facility and equipment, and an optional $6,000,000 for envelope improvements including roofs and windows. The project's construction duration is estimated at 20 months, indicating a substantial and complex infrastructure improvement initiative. The procurement is being conducted under the authority of Governor Brian P. Kemp and will be managed by the Georgia State Financing & Investment Commission Construction Division, located in Atlanta.
Opportunity text
The Georgia State Financing and Investment Commission (GSFIC), as ¿Owner¿, on behalf the Georgia Department of Corrections (¿Using Agency¿ or ''GDC''), is seeking firms interested in providing building commissioning services for a project known as Project No.GDC-164A Autry State Prison Campus Wide Upgrades.
Files
| File | Type | Posted |
|---|---|---|
| GDC_164A_Cx RFQ_Two_Step.pdf | ||
| Shortlisted Firms.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity