Garrie Cut-Off Bridge Replacement Project

Open State & local contract opportunity Posted

Solicitation number
26-303-0005
State
Louisiana
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The Calcasieu Parish Police Jury, Division of Engineering, is soliciting sealed electronic bids for the Garrie Cut-Off Bridge Replacement Project (Project No. 26-303-0005), with bids due November 17, 2026, at 2:30 p.m. Central Time at the Parish Government Building in Lake Charles. Bidders must hold a Louisiana contractor license under Louisiana Revised Statutes 37:2150-2163 in the "Highway, Street, and Bridge Construction" classification. Paper bids will not be accepted, and all bids must be submitted through www.bidexpress.com.

The project replaces an existing timber bridge with a new cast-in-place slab-span bridge and includes local drainage improvements and erosion protection within the channel. The document requires minority subcontractor participation of at least 10 percent, pre-employment and random drug screening, and E-Verify compliance for all employees.

Bid security equals 5 percent of the base bid plus all alternates, in the form of an electronic bid bond from an approved surety. The successful bidder must furnish performance and payment bonds, each equal to 100 percent of the contract amount. Required insurance includes Commercial General Liability of $1,000,000 per occurrence and $2,000,000 general aggregate, plus a $5,000,000 Umbrella/Excess Policy. Payment is based on verified actual quantities at unit prices on the Louisiana Uniform Public Work Bid Form. Retainage is 10 percent for contracts under $500,000 and 5 percent for contracts of $500,000 or greater. Louisiana sales and use tax exemption applies to purchases directly related to project work, and stipulated damages apply to completion delays under the Special Provisions. The Parish reserves the right to reject any and all bids for just cause.

The contract term runs from execution until project completion, with substantial completion required within a timeframe stated in the Notice to Proceed. No site visit or bidders' conference date is mandated, though the engineer may coordinate a pre-bid conference.

Opportunity text

This project involves replacing an existing timber bridge with a new cast-in place slab-span bridge, local drainage improvements, and erosion protection within the channel.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity