The Missouri Department of Transportation is soliciting bids for the FY27 NE Kirksville Maintenance Building Metal Siding Project to replace existing vinyl siding and install new 26-gauge prefinished metal siding, with bids due September 17, 2026 and mandatory site visit attendance required for all bids to be accepted.
This is a prevailing-wage project under Missouri Annual Wage Order No. 33 for Adair County, with hourly rates ranging from $26.28 to $76.96 depending on occupational classification and applicable fringe benefits. Overtime is required at 1.5 times the prevailing rate for work exceeding ten hours daily or forty hours weekly, and twice the rate for work on Sundays or designated holidays.
The scope encompasses demolition of existing roofing materials and passage doors; installation of metal roof and wall panels with 26-gauge thickness, .80 mils top coat paint, and a 40-year paint adhesion warranty; framing and sheathing; flashing and sheet metal work; joint sealers; standard steel doors and frames; door hardware; and glazing. Metal siding panels must meet wind uplift resistance (UL580 Class 90), impact resistance (UL2218 Class 4), and fire resistance (UL790) ratings. Acceptable manufacturers are Central States and Mac Steel Inc., with equivalent products subject to architect approval. All work must comply with SMACNA Architectural Sheet Metal Manual standards.
The contractor must provide all temporary facilities including electricity, water service, sanitary facilities, fencing, and site security at cost. Construction progress schedules and proposed products lists are due within 15 days after Notice to Proceed. Schedules of values are due within 20 days of the Owner-Contractor Agreement, with 30-day payment application periods. All punch list items must be completed before MoDOT acceptance, with closeout paperwork due within 30 days thereafter; failure to meet this deadline may result in debarment or suspension from future projects.
Bids are received electronically through MissouriBUYS or via mail, UPS, or FedEx. Bidders submitting hard copy bids must contact buyer Logan Wilbers at logan.wilbers@modot.mo.gov at least five business days before bid closing.
Opportunity text
MoDOT seeks qualified bidders to replace existing vinyl siding and install new 26-gauge prefinished metal siding on its Kirksville Maintenance Building. MoDOT will receive bids electronically through MissouriBUYS, via mail, UPS, or FEDEX. It is required you contact the buyer of record via email logan.wilbers@modot.mo.gov five (5) business days before bid closing if you intend to submit a hard copy bid. Site visit attendance is mandatory for bids to be accepted.
Files
| File | Type | Posted |
|---|---|---|
| MODOT 0000000395SL_1_SUPPLIER.pdf | ||
| AWO 33.pdf | ||
| Kirksville Project Office Metal Siding.pdf | ||
| section 01300 and 01700.pdf | ||
| Kirksville Metal Siding MainSpec.docx | DOCX document |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity