FY14 KT0 FMA CRANEHOIST and TROLLEY REPLACEMENT
Closed State & local contract opportunity Posted
- Solicitation number
- Doc161444
- State
- District of Columbia
- Responses due
Opportunity facts
Opportunity details come from contracts.ocp.dc.gov. Updated .
About this opportunity
The District of Columbia has issued a state and local contract opportunity for the FY14 KT0 FMA Cranehoist and Trolley Replacement procurement, which appears to be a specialized equipment replacement project. The contract, identified by the unique ID 66c85c81829eb5d869073f62, was posted on July 11, 2014, with a proposal submission deadline of July 25, 2014. This procurement seeks comprehensive replacement services for cranehoists and trolley systems, likely within a municipal or transportation infrastructure setting. Potential bidders will need to demonstrate technical expertise in heavy equipment replacement, industrial machinery integration, and potentially complex mechanical system installations. The procurement requires detailed technical proposals that demonstrate capability to fully replace existing cranehoist and trolley infrastructure with minimal operational disruption.
While specific set-aside designations are not explicitly detailed in the provided information, contractors should anticipate potential local or small business preferences typical of District of Columbia procurements. The contract likely involves significant mechanical engineering and installation capabilities, suggesting that respondents will need substantial industrial equipment expertise and relevant certification credentials. Given the specialized nature of cranehoist and trolley replacement, the project may have a substantial budget range, potentially between $100,000 and $500,000, though exact funding parameters are not specified in the available documentation. Interested vendors should carefully review all technical specifications and be prepared to provide comprehensive documentation of their qualifications, previous similar project experiences, and detailed implementation strategies for the proposed equipment replacement.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity