FY 2026-27 Annual Major Streets Rehabilitation Program: Alamo Street (Erringer Road to Gage Avenue)
Closed State & local contract opportunity Posted
- Solicitation number
- SV 26-25R
- State
- California
- Responses due
Opportunity facts
- Jurisdictions
- Point of contact
-
- Antonio Agoncillo aagoncillo@simivalley.org (805) 583-6831
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
San Francisco is requesting bids on the FY 2026-27 Annual Major Streets Rehabilitation Program: Alamo Street (Erringer Road to Gage Avenue), Project CP60000018, with bids due September 24, 2026.
The scope encompasses full-width street rehabilitation including 153,977 square feet of 2½-inch cold milling, 2,500 tons of asphalt rubberized hot mix placement, 620 square feet of Portland cement concrete sidewalk replacement, 72 linear feet of sidewalk grinding, six linear feet of curb and gutter replacement, six curb ramp reconstructions, three storm drain manhole adjustments, five sewer manhole frame/ring/cover replacements, seven water valve frame/ring/cover replacements, tree work (20 linear feet each of root pruning and root barrier placement, one tree removal), construction surveying, remove and reinstall two traffic signal loops, traffic signing and pavement delineation, and stormwater pollution control.
No estimated contract value, budget range, contract term, set-aside or preference program, evaluation criteria, or procurement timeline details beyond the bid due date are provided in the source material.
Opportunity text
As described in the Bidding Documents, the bids are for a public works project FY 2026- 27 Annual Major Streets Rehabilitation Program: Alamo Street (Erringer Road to Gage Avenue), CP60000018 (Project) which include, but are not limited to: 1) construction surveying; 2) 20 L.F. of root pruning; 3) 20 L.F. of root barrier placement; 4) one (1) tree removal; 5) 153,977 S.F. of 2 1/2" full width cold milling; 6) 620 S.F. of PCC sidewalk replacement; 7) six (6) L.F. of curb and gutter replacement; 8) six (6) curb ramp reconstructions; 9) 72 L.F. of PCC sidewalk grinding; 10) 2,500 tons of asphalt rubberized hot mix placement; 11) three (3) storm drain manhole adjustments; 12) five (5) sewer manhole frame, ring, and cover removal and replacements; 13) seven (7) water valve frame, ring and cover removal and replacements; 14) traffic signing and pavement delineation; 15) stormwater pollution control; 16) remove and reinstall two (2) traffic signal loops; and 17) all appurtenant work.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity