FTTH Construction 2025 ElbertonNET System Upgrade
Closed State & local contract opportunity Posted
- Solicitation number
- PE-66412-NONST-2025-000000015
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
- 43221700 Fixed network equipment and components
- 43221528 Supervisory signal unit
- 43221748 VHF receivers and associated equipment
- 43221749 Cellular equipment
- 43221806 Synchronous optical network SONET network equipment
- 72141116 Television cable laying service
- 43221744 Emergency locating transmitter
- 43221527 Wire tapping protector
- 43221808 Synchronous digital hierarchy SDH telecom equipment
- 43221529 Call meter
Show all 40
- 43221810 Optical multiplexer
- 43221745 HF transmitter and associated equipment
- 95131607 Telecom shelter
- 72103302 Telecom equipment maintenance or support
- 72141115 Electrical cable laying service
- 26121507 Radio or television wire
- 26121616 Telecommunications cable
- 43221731 Underwater communication system
- 43221732 Speaker control unit
- 72141117 Telephone and communication cable laying service
- 26121608 Aerial cable
- 26121609 Network cable
- 26121623 Radio frequency RF cable
- 26121632 Outside plant communications cable
- 26121633 Outside plant telecommunications cable
- 26121666 Communication cable assembly
- 26121667 Backplane input output cable
- 72151521 Electric instrumentation communication cable service
- 43200000 Components for information technology or broadcasting or telecommunications
- 43221521 Telecommunications remote access unit
- 43221534 Radio link system
- 43221535 Intercom system maintenance tools and accessories
- 43221747 UHF transmitters and associated equipment
- 43221809 Optical transmitter
- 43221811 Optical switch
- 43222815 Telecommunication terminal units
- 43222817 Telecommunication repeaters
- 43222828 Frequency division multiplexer
- 72151602 Fiber optic cable installation service
- 72154005 Cable splicingservice
- Point of contact
-
- Tiffany Barry tbarry@dccm.com (706) 213-3105
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The City of Elberton, Georgia is seeking bids for the ElbertonNET System Upgrade, a comprehensive Fiber-to-the-Home (FTTH) network construction project covering approximately 124 plant miles across multiple HFC Node Boundaries in Dooly County and Elbert County. The procurement involves constructing a next-generation fiber optic network infrastructure, which includes overlashing 607,118 linear feet of fiber optic cable and direct burial of 50,729 feet of fiber. The primary objective is to transition 3,705 existing ElbertonNET subscribers from a legacy HFC system to a new XGS/25G-PON fiber-optic network, significantly enhancing network capacity, reliability, and scalability. Bidders must submit a comprehensive bid package containing a detailed cost summary, bid certification, federal work authorization forms, and a mandatory bid bond of at least 5% of the total bid amount. The bid is scheduled to be opened on July 30, 2025, with a projected project completion timeline of 18 months from contract execution. The City will supply all materials and cabling, while the selected contractor must provide labor, tools, and equipment to complete the installation.
The contract does not explicitly outline specific set-aside designations or restrictions for disadvantaged enterprises. Contractors will be required to provide performance and payment bonds equal to 100% of the contract amount and maintain comprehensive insurance coverage, including $1,000,000 in bodily injury and property damage liability. The project will cover areas within Elberton city limits and surrounding rural areas of Elbert County, with fiber routing along main roads and supporting distribution configurations of 12, 24, and 36-fiber counts. While the exact contract value is not specified in the documentation, the extensive infrastructure requirements and 124-mile construction scope suggest a significant investment. Potential bidders should note that the project involves complex network infrastructure work, requiring specialized expertise in fiber optic installation, network engineering, and municipal telecommunications infrastructure deployment. The successful contractor will need to demonstrate technical proficiency, robust project management capabilities, and the ability to execute a large-scale network upgrade within the specified 18-month timeframe.
Opportunity text
The project includes approximately 124 plant miles of construction, encompassing the overbuild of existing HFC Node Boundaries 1, 2, 3, 4, 5, 8, 13, 14, 16, 17, 18, 25, 26, and 27, identified as Phases 1 and 2 of the network upgrades
Files
| File | Type | Posted |
|---|---|---|
| FTTH Construction Bid Packet 2025_Rev.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity