Fraser river trail improvements
Closed State & local contract opportunity Posted
- Solicitation number
- 2025-TOWP-02
- State
- Colorado
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC code
Opportunity details come from bidnetdirect.com. Updated .
About this opportunity
The Town of Winter Park, located in Colorado's Gilpin County, is soliciting bids for the Fraser River Trail Improvements project (Solicitation No. 2025-TOWP-PW-02), a comprehensive trail rehabilitation initiative. The procurement involves the full-depth reconstruction of designated trail segments, with specific requirements including removal and disposal of existing asphalt pavement, subgrade scarification, recompaction, aggregate subbase installation, and new asphalt paving. Bidders must submit a comprehensive package including a bid form, bid schedule, and bidder's qualification statement, demonstrating technical capability and relevant project experience. The project's key objectives include enhancing trail durability, smoothness, and usability for recreational and transportation purposes along approximately 1-2 miles of trail segments near Highway 40. Bid submissions are due on March 17, 2025, at 3:00 P.M., with a deadline for submitting questions set for March 10, 2025. Potential bidders may request a site visit via email, and all participants must possess a Town of Winter Park Business License. The evaluation criteria will consider not only the lowest price but also factors such as quality, past experience, qualifications, and long-range project costs.
The procurement appears to have no specific set-aside designations for disadvantaged enterprises, but there is a preference for Colorado resident bidders if the contract value exceeds $500,000. Bidders must provide detailed information about their company, previous project experience, proposed staff, and subcontractors. The contract includes mandatory bonding requirements, specifically 100% bid, performance, and surety bonds. While a specific contract value is not explicitly stated, the project will be funded through the Town's appropriated budget, with potential daily liquidated damages ranging from $350 to $2,250 for project completion delays. The engineering documents, prepared by JVA, Inc., indicate this is a municipal infrastructure improvement project focused on trail reconstruction. The bid is open to qualified contractors with demonstrated experience in trail rehabilitation, subgrade preparation, and asphalt paving, with the Town reserving the right to award the contract to the most responsible and responsive bidder.
Opportunity text
The scope of work consists of removal and disposal of the existing asphalt pavement on designated portions of the Fraser River Trail. Scarify the existing subgrade to the specified depth. Recompact the subgrade to meet the required compaction standards and ensure a stable base for subsequent layers. Supply, place, and compact the specified aggregate subbase material to meet project thickness requirements. Ensure proper grading and smoothness for the placement of asphalt paving. Install new asphalt pavement as specified. Achieve proper compaction, smoothness, and alignment to ensure durability and usability. Detailed specifications, quantities, and drawings are provided as part of the bid package. Please see documents.
Files
| File | Type | Posted |
|---|---|---|
| 1566.105c-Fraser River Trail Improvements-2024 12 03 (2).pdf | ||
| FRASER RIVER TRAIL IMPROVEMENTS BID DOCUMENT 2025.docx | DOCX document |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity