Franklin Boulevard Cycle Track Elk Grove Boulevard to Laguna Boulevard Project

Closed State & local contract opportunity Posted

Solicitation number
WAM019 (Federal Project: STPL-5479(088))
State
California
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The City of Elk Grove, California, is requesting bids on the Franklin Boulevard Cycle Track project (WAM019), a federally-funded public works initiative to replace the existing Class II bike lane with one-way Class IV bikeways or cycle tracks between Elk Grove Boulevard and Laguna Boulevard, with bids due September 15, 2026 at 10:00 a.m. local time via PlanetBids.

The scope includes installation of a surface-mounted concrete curb strip and flexible delineators along the concrete curb strip on Franklin Boulevard. This is a public works project subject to prevailing wage and labor compliance requirements. All contractors and subcontractors must be registered with the California Department of Industrial Relations pursuant to Labor Code Section 1725.5, unless the project qualifies for specified exemptions. Bidders must possess a current valid California State Class "A" General Engineering License and/or Class "C-8" Concrete Contractor's License.

The Opinion of Probable Cost is $376,250. Electronic bids must be submitted through the City of Elk Grove Vendor Portal via PlanetBids. Bid documents are available for examination and download at City Hall (8401 Laguna Palms Way, Elk Grove, CA 95758) or through PlanetBids, with physical copies available for a non-refundable fee of $25.00 for in-person pickup or $35.00 for mailing. No pre-bid meeting has been scheduled. For project information and specifications, bidders should contact Project Manager Travis Kuhn at (916) 627-3262 or Administrative Assistant Kim Marlan at (916) 627-3315. Any addenda will be issued exclusively through the City of Elk Grove Vendor Portal via PlanetBids.

Opportunity text

Description of Work: The proposed work shall be performed in accordance with the plans, specifications and other Contract Documents and shall include the following: Replacement of the existing Class II bike lane with one-way Class IV bikeways or cycle tracks on Franklin Boulevard between Elk Grove Boulevard and Laguna Boulevard. The Work includes installing a surface mounted concrete curb strip and mounting flexible delineators along the concrete curb strip

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors