Follins Pond Green Stormwater Infrastructure

Closed State & local contract opportunity Posted

Solicitation number
BD-27-1355-TYARM-YADPW-131632
State
Massachusetts
Responses due

Opportunity facts

NIGP code
UNSPSC code
Point of contact

Opportunity details come from commbuys.com. Updated .

About this opportunity

The source does not identify the specific issuing body (city, town, county, or regional authority within Massachusetts). Without this information, I cannot write the required lead sentence, which must name the precise governmental entity taking the action. The source provides only the project name, location references (Gun Rock Road, Follins Pond Road), state (Massachusetts), posting date (July 29, 2026), and proposal due date (August 19, 2026), along with a scope description of green stormwater infrastructure installation.

To produce a complete summary meeting the stated requirements, I need the issuing body's name and title. Please provide the municipality, county, or authority responsible for this solicitation.

Opportunity text

Installing 28 Leaching Infiltration Chambers beneath Gun Rock Rd; Installing 2 Catch Basins & 1 Water Quality Unit, & Connecting them with the Leaching Infiltration Chambers; Constructing 3 Infiltration Trenches w/ 12-inch perforated HDPE pipes backfilled with crushed stone within & parallel to Gun Rock Rd & Follins Pond Rd. Construction new catch basins & manholes, connecting trenches to the new basins & manholes, replace existing grates

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors