Fire Station No. 49 - Otay Mesa

Open State & local contract opportunity Posted

Solicitation number
K-27-2522-DB2-3
State
California
Responses due

Opportunity facts

Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The City of San Diego is soliciting design-build proposals for the design and construction of Fire Station No. 49 in Otay Mesa, with responses due December 15, 2026. The notice was posted November 17, 2026.

The attached Request for Proposals covers a new, permanent 14,000-square-foot fire station that preferably is a single-story structure. The facility must accommodate three fire apparatus and a crew of nine to eleven fire personnel, with eleven dorm rooms, plus a lobby, offices, kitchen, training and exercise rooms, watch, ready, and turnout rooms, decontamination areas, a station alerting system, an IT data network, and wet and dry utilities, electrical, and mechanical systems. Offsite work includes site grading, pad preparation, and street and traffic improvements along Ocean View Hills and Sea Fire Point to allow emergency apparatus egress and ingress.

Design and construction must comply with the city's Zero Emissions Municipal Building Operations Policy (ZEMBOP) and its sustainable building policy. The site is adjacent to Multi-Habitat Planning Areas (MHPA), so the work requires environmental conformance with the existing Environmental Impact Report (EIR) and other jurisdictional regulations.

Place of performance is Otay Mesa within the City of San Diego, San Diego County, California.

Opportunity text

The City is seeking to acquire Design-Build services for the design and construction of a new, permanent, 14,000 square feet, 3-bay fire station. The Fire Station will preferably be a singlestory structure. The Fire Station will accommodate: three (3) fire apparatus and a crew of nine (9) to eleven (11) fire personnel; 11 dorms; bathrooms; office rooms; lobby; onsite surface parking; dorm rooms; kitchen; watch room; training room; exercise room; ready room; turnout room; decontamination areas; station alerting system; IT data network; wet and dry utilities; electrical; mechanical; and all other necessary infrastructure associated with this project. In addition, the offsite improvements include, but are not limited to, site grading; pad preparation; street/traffic improvements within the public right-of-way along Ocean View Hills and Sea Fire Point to allow for emergency response apparatus egress & ingress. The facility design and construction shall comply with zero emissions municipal building operations policy (ZEMBOP) and sustainable building policy. The project site is adjacent to Multi-Habitat Planning Areas (MHPA). Environmental conformance with the existing Environmental Impact Report (EIR) and other jurisdictional regulations will be required.

Files

File Type Posted
Fire Station No. 49 - Otay Mesa.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors