Fiber Installation

Closed State & local contract opportunity Posted

Solicitation number
BD-25-26
State
New York
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The Board of Public Utilities (BPU) of the City of Jamestown, New York is requesting sealed bids for on-call fiber service drop installation, premise installation, and subscriber support services under BD-25-26, with bids due October 23, 2026 at 11:00 a.m. and tentative award on October 27.

Bidders must demonstrate a minimum of three years of continuous fiber-to-the-premise (FTTH) installation experience, maintain a fully trained field workforce capable of meeting mandatory 72-hour aerial and 7-day underground service-level activation windows, own or have verified lease access to specialized tools including fusion splicing machines and optical time-domain reflectometers (OTDRs), and provide references from at least two municipal or commercial telecom deployment projects completed within the last twenty-four months. Prevailing wage rates for Chautauqua County apply to all work.

The scope encompasses aerial drop installations (up to 150 feet standard), underground direct-bury drops (minimum 12-inch depth), premise installations with optical network unit (ONU) placement and subscriber activation, and subscriber support troubleshooting and repair calls. Work is performed progressively on an as-needed dispatch basis within the BPU service area in and around Jamestown. All work must comply with ANSI/TIA-568 optical fiber cabling standards with acceptable light loss not exceeding 2.18 dB. The contractor must establish a local office and warehouse facility within the service area within five days of contract start.

Compensation is structured on a per-unit basis according to bidder-submitted pricing schedules; bidders must complete both Schedule A (no guaranteed daily minimum) and Schedule B (with guaranteed daily minimum) pricing. The maximum not-to-exceed cap is $300,000.00 with no guaranteed minimum total volume of work. The contract term is twelve months from the effective date of the signed contract, anticipated October 28, 2026. A proposal bond of $25,000.00 and a performance bond of $50,000.00 are required. Payment terms include monthly invoices with ten percent retainage pending final completion and acceptance, with full payment released following BPU approval and lien clearance.

Opportunity text

The general scope of work for BD-25-26 consists of providing on-call, per-unit professional labor, tools, equipment, and incidental hardware necessary to perform Fiber Service Drop Installation, Premise Installation, and Subscriber Support. All work shall be performed progressively on an as-needed dispatch basis within the designated Board of Public Utilities (BPU) fiber service area in and around Jamestown, New York.

Files

File Type Posted
BD-25-26 Fiber Installation.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity