The Metropolitan Council is requesting sealed bids for fan wall system installation at East Metro Garage (Contract 26P120, Project 64800), with bids due October 15, 2026 at 2:00 p.m. via Microsoft Teams and a mandatory pre-bid meeting and site visit on September 22, 2026 at 10:00 a.m. via Microsoft Teams followed by an on-site visit at 820 L'Orient Street, St. Paul, Minnesota at 1:00 p.m. The Metropolitan Council has established a Minority- and Women-owned Utilization Business (MCUB) participation goal of 7% for this contract.

The scope includes demolition of the existing HVAC return fan and structural support; installation of two new QPAC fan array wall systems with new frame, sheet metal components, electrical equipment, and power distribution; programming and integration with the existing Building Automation System (BAS); and testing, balancing, commissioning, and closeout to deliver a fully operational system. Only registered Plan Holders may submit bids. All bids must be submitted electronically through QuestCDN.com. Project plan documents are available through QuestCDN (eBidDoc 10368893) for a nonrefundable $6.00 download fee.

The work is performed at East Metro Garage in Ramsey County, Minnesota. No contract value or term is specified in the advertisement. Inquiries should be directed to the Metropolitan Council's Contract Administrator, Kimberley Ruedy, at Kimberley.ruedy@METC.state.mn.us. Bidders are encouraged to verify subcontractor debarment and suspension status through the state's designated reporting website.

Opportunity text

The work of this project includes: This project replaces the existing HVAC return fan with two new QPAC fan array wall systems, including demolition of existing equipment and structural support; installation of new frame, sheet metal components, electrical equipment, power distribution, controls, and all associated incidental work; programming and integration with the existing Building Automation System (BAS); and testing, balancing, commissioning, and closeout to deliver a fully operational system.