EV Charging Station Installation and EV Purchase Phase II & Phase III

Closed State & local contract opportunity Posted

Solicitation number
2026-06, CRPL-5134(033)
State
California
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The City of Imperial is soliciting bids for EV charging station installation and associated electrical and site work under Phase II and Phase III, with proposals due October 8, 2026. The scope includes furnishing and installing two 180-kW all-in-one DC fast charging stations, reinforced-concrete charger pads, underground electrical feeder conduit extension from existing Phase I infrastructure, electrical conductors, grounding, terminations, switchgear connections, site restoration (sawcutting, trench excavation, backfilling, compaction, asphalt pavement restoration, striping), testing, commissioning, network and payment-system activation, and traffic control. All work occurs within City of Imperial public right of way and property.

The existing pad-mounted transformer, primary electrical service, traffic-rated pull box, and 2,500-amp switchgear from Phase I remain in place and are not supplied under this contract. The contractor must verify final connection points and existing facility locations using approved Phase I as-built plans and coordinate with the City prior to construction start. The contractor is responsible for all quality control testing to verify material and workmanship compliance; contractor-performed QC testing does not replace or limit the City's right to conduct independent QA, acceptance, or independent assurance testing.

The source does not identify a contract value, incumbent, evaluation criteria weighting, pre-bid meeting date, question deadline, or anticipated award date.

Opportunity text

The work consists generally of furnishing and installing two (2) 180-kW all-in-one DC fast charging stations, one for Phase II and one for Phase III, including reinforced-concrete charger pads; installation and extension of underground electrical feeder conduits from the existing Phase I infrastructure; electrical conductors, grounding, terminations, and connections to the existing switchgear; sawcutting, trench excavation, backfilling, compaction, asphalt pavement restoration, removal of conflicting pavement markings, thermoplastic striping, testing, commissioning, network and payment-system activation, and traffic control. The existing IID pad-mounted transformer, IID primary electrical service, traffic-rated pull box, and 2,500-amp switchgear installed under Phase I shall remain and are not equipment to be furnished under this contract. The Contractor shall verify the final point of connection and existing facility locations using the approved Phase I as-built plans. All work to be completed within existing City of Imperial public right of way and property. The scope of work includes, prior to the start of construction, the coordination between the City of Imperial and the Contractor. The Contractor will be responsible for all quality control (QC) testing necessary to verify that its materials and workmanship comply with the Contract Documents. Contractor-performed QC testing shall not replace or limit the Citys right to conduct independent QA, acceptance, or independent assurance testing.