Engineering Services for the River West Fresno Eaton Trail Extension Project
Closed State & local contract opportunity Posted
- Solicitation number
- 12700518
- State
- California
- Responses due
Opportunity facts
- Jurisdictions
- Point of contact
-
- Yue Lehman yue.lehman@fresno.gov (559) 621-8600
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of Fresno Capital Projects Department is requesting qualifications from environmental consulting firms to provide professional services for the River West Fresno Eaton Trail Extension Project, with SOQs due October 21, 2026 at 5:00 p.m. (PDT).
The scope includes biological surveys for plant and animal species according to applicable guidelines and Extended Phase 1 Subsurface Testing as required by the Mitigation Monitoring and Reporting Program (MMRP) of the Final Environmental Impact Report (FEIR). Consultants must compile survey and testing results into a final report and coordinate with the project's construction contractor to perform tasks during timeframes specified in the MMRP. The project is funded through a State of California Wildlife Conservation Board Implementation Grant.
The contract will be awarded on a lump sum basis. The submission format requires five hard copies delivered in person or by carrier to the Capital Projects Department, 747 R Street, 2nd Floor, Fresno, California 93721, attention Yue Lehman. No pre-bid meeting or online Q&A session is scheduled. Late submissions will not be accepted. No bid bond, payment bond, or performance bond requirements are specified.
Opportunity text
he City of Fresno (City) Capital Projects Department is issuing this Request for Qualifications (RFQ) for Statement of Qualifications (SOQ) from qualified Environmental Consulting firms to provide professional services for the capital improvement project at River West Fresno area as shown in the attached vicinity map. Funding for this project will be through State of California Wildlife Conservation Board Implementation Grant. Services will include performing biological surveys according to various guidelines for different plant or animal species and Extended Phase 1 Subsurface Testing as required in the Mitigation Monitoring and Reporting Program (MMRP) of the FEIR. The survey and testing results shall be prepared in a final report. In the MMRP, the specific scope of services requested are labeled in the Completion of Implementation column, under the Action column as RFQ and listed here. The Consultants shall coordinate with the Projects construction contractor to perform the tasks during the time period specified in the MMRP
Files
| File | Type | Posted |
|---|---|---|
| Bid Notice.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity