Engineering Design Services GDOT PI#0021595 PTC 25-08 SR 141 Sidewalks TAP

Closed State & local contract opportunity Posted

Solicitation number
PE-66790-NONST-2027-000000032
State
Georgia
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from ssl.doas.state.ga.us. Updated .

About this opportunity

The City of Peachtree Corners is requesting Statements of Qualifications from engineering firms to provide design and construction administration services for approximately 0.50 miles of new sidewalk along SR 141/Peachtree Parkway, with SOQs due October 9, 2026 at 4:00 p.m. The Prime Consultant must hold GDOT prequalification in Area Classes 3.02 (Urban Roadway Design) and 3.13 (Bicycle and Pedestrian Facility Design), a capability filter.

The project addresses two pedestrian-network gaps: one connecting sidewalks between Engineering Drive and Scientific Drive, and another between Triangle Drive and Peachtree Corners Circle. Associated improvements include grading, curb and gutter construction, sod replacement, and safety rail installation where warranted. The scope encompasses preliminary engineering services through final design completion, with potential inclusion of construction administration and inspection services. The design team must collectively hold GDOT prequalifications in NEPA documentation, environmental studies, traffic operations, landscape architecture, utility coordination, surveying, materials testing, construction engineering, and erosion control.

The City will select three to five finalists in Phase I (qualifications and experience) and invite those finalists to Phase II for technical approaches and past-performance information. The selection process anticipates awarding one multi-phase, project-specific contract. Preliminary Engineering Notice to Proceed is targeted for FY 2027, with construction contract letting targeted for FY 2031. Contract type and payment method will be determined through negotiations, potentially including Cost Plus Fixed Fee, Fixed Price/Lump Sum, Cost per Unit of Work, or Specific Rates of Compensation.

Respondents must comply with audit and accounting system requirements under 48 CFR Part 31 or OMB Circular A-122 and submit CPA overhead audits if aggregate contracts exceed $250,000. Written questions are due by September 30, 2026. A communication blackout is in effect; respondents must submit inquiries to James Nguyen (jnguyen@peachtreecornersga.gov) only. All SOQs must be submitted electronically as PDFs to publicworks@peachtreecornersga.gov and comply with specified page and formatting requirements.

Opportunity text

City of Peachtree Corners (the Community) is soliciting Statement of Qualifications (SOQs) from qualified firm(s) or organization(s) to provide consultant services for design and construction administration for an approximately 0.50 miles of new sidewalk along SR 141/Peachtree Parkway. The project will close two existing gaps in the City's pedestrian network by connecting sidewalks between Engineering Drive and Scientific Drive, and between Triangle Drive and Peachtree Corners Circle. The project will also include associated improvements such as grading, curb and gutter construction, sod replacement, and safety rail installation where warranted. This Request for Qualifications (RFQ) seeks to identify potential providers for the Scope of Services for the project/contract listed in Exhibit I. Firms that respond to this RFQ and are determined by the Community to be sufficiently qualified, may be deemed eligible, and invited to offer a technical approach and/or possibly present and/or interview for these services. All respondents to this RFQ are subject to instructions communicated in this document and are cautioned to completely review the entire RFQ and follow instructions carefully. The Community reserves the right to reject any or all SOQs or Technical Approaches, and to waive technicalities and informalities at the discretion of the Community.

Files

File Type Posted
0021595 Gwinnett 2026_07_21 RFQ 25_08.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity