El Dorado Beach Revetment Phase 2

Closed State & local contract opportunity Posted

Solicitation number
26-30160086-01-BN1
State
California
Responses due

Opportunity facts

Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The City of South Lake Tahoe Department of Public Works is requesting bids for El Dorado Beach Revetment Phase 2, a beach stabilization and restoration project with bids due July 30, 2026 at 2:00 p.m. and a non-mandatory pre-bid conference on July 16 at 3:00 p.m. via Microsoft Teams.

The scope includes removal of twelve 12-inch CMP storm drain pipes, removal of Super Sack sandbags, removal and salvage of existing sand and riprap, installation of various classes of riprap as new revetment, beach replenishment, infiltration pit installation, traffic control, installation and maintenance of temporary best management practices including a temporary water-filled dam barrier, and utility protection and coordination, all in compliance with regulatory permits and City of South Lake Tahoe Public Improvements and Engineering Standards.

Bidders must hold a California Class A General Engineering Contractor's License. The work is subject to California prevailing wage requirements under Labor Code Section 1771.1, with certified payroll reporting required through the state electronic system. Contractors must demonstrate 30 percent self-performance and submit performance and payment bonds each equal to 100 percent of the contract sum.

The estimated cost for the Base Bid Schedule is between $400,000 and $600,000. The City will award to the lowest responsive, responsible bidder; the Total Base Bid Price includes the Base Bid Schedule Price plus the Daily Rate of Compensation for Compensable Delay multiplied by 60 calendar days. Bid security of at least 10 percent of the total aggregate bid price is required. Substantial completion is due within 30 calendar days by October 8, 2026, and final completion within 35 calendar days by October 15, 2026. Excavation and grading are restricted to May 1 through October 15. Liquidated damages are $500 per calendar day for failure to achieve substantial completion and $1,000 per calendar day for failure to achieve final completion. The anticipated Notice to Proceed is September 8, 2026.

Opportunity text

Scope of Services: Work to be performed includes: removal of existing 12 CMP storm drain pipes, removal of Super Sack sandbags in beach, removal and salvage of sand and riprap on beach, installation of various classes of riprap as new revetment, replenishment of beach, installation of infiltration pit, traffic control, installation, maintenance, and removal of temporary BMPs including temporary water filled dam/barrier, utility protection and coordination, compliance with regulatory permits, and all other work as described in the Contract documents, including, without limitation, project construction drawings, bid documents, Special Provisions, City of South Lake Tahoe Public Improvements and Engineering Standards, and the 2022 edition of the California Department of Transportation Other Details.

Files

File Type Posted
Bid Notice-El Dorado Beach Revetment Phase 2.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors