About this opportunity
The Village of Fort Edward is soliciting bids for the East Street Water Main Replacement project, with bids due August 3, 2026. The procurement carries a 30% Minority / Women Business Enterprise (MWBE) contracting goal; the prime contractor WM.J Keller is actively seeking DBE/WBE subcontractors for asphalt paving/milling, concrete curb/sidewalk, pipe supply, aggregate supply, trucking, and traffic control.
The scope includes replacement of approximately 1,700 linear feet of existing 8-inch cast iron water main with a 10-inch PVC water main along East Street, with installation of valves, fittings, hydrants, and service connections up to the curb stop. Work encompasses connection to existing water mains, abandonment of the existing main, flushing, testing, and disinfection of the new main. The project also requires pavement and subbase removal and replacement, restoration of all disturbed surfaces to match existing grades, and milling and overlay of East Street within the project limits. Additional obligations include maintenance and protection of traffic, protection of existing utilities, coordination with utility companies, site restoration, and preparation of record drawings. All improvements constructed within East Street shall be dedicated to the Village upon completion. Work shall conform to the Contract Documents and applicable Village of Fort Edward standards.
The SDVOB goal is 0.00% and the DBE goal is 0.00%. Plans and specifications are available via the referenced document link.
Opportunity text
The project includes the replacement of approximately 1,700 linear feet of existing 8-inch cast ironwater main with a 10-inch PVC water main along East Street, including installation of valves,fittings, hydrants, service connections up to and including the curb stop, and all associatedappurtenances. Work also includes connection to existing water mains, abandonment of the existingwater main, and flushing, testing, and disinfection of the new main. Additional work includespavement and subbase removal and replacement, restoration of all disturbed surfaces to matchexisting grades, and milling and overlay of East Street within the project limits shown. The projectalso includes maintenance and protection of traffic, protection of existing utilities, coordinationwith utility companies, site restoration, and preparation of record drawings. All work shall beperformed in accordance with the Contract Documents and applicable Village of Fort Edwardstandards, and all improvements constructed within East Street shall be dedicated to the Villageupon completion. WM.J Keller is currently looking for DBE/WBE Subcontractors to perform the following services: Asphalt Paving/Milling Concrete Curb/Sidewalk Pipe Supplier Aggregate Supplier Trucking Traffic Control To obtain plans and specs for this project please follow link below: Access Documents Here Thank you! Service-Disabled Veteran-Owned Business (SDVOB) SDVOB Goal: 0.00% Minority / Women Business Enterprise contracting goals (MWBE) Total MWBE Goals: 30.00% Disadvantaged Business Enterprise contracting goals (DBE) DBE Goal: 0.00%