Eager Park Improvement Project
Closed State & local contract opportunity Posted
- Solicitation number
- 2026-10
- State
- California
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Anthony Lopez alopez@imperial.ca.gov (760) 355-3134
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Imperial County, California is requesting bids on the Eager Park Improvement Project with proposals due October 13, 2026. The scope encompasses construction and installation of a 40 by 24 hip structure with fabric roof and steel frame at 12-foot entry height, site preparation, surfacing, and playground equipment.
The structure must have all above-ground hardware — bolts, clamps, and cables — in stainless steel, with spread footing foundation. Site work includes removal and disposal of existing Engineered Wood Fiber and natural soil; installation of 12 inches of Class Two base material; furnishing and installation of pour-in-place rubber surfacing with 0.5–1.5mm granule size and aliphatic resin in four colors (Blue, Orange, Yellow, Red); and installation of Engineered Wood Fiber with fabric at 12-inch depth with standard 25–50% compaction rate. Containment curbing includes an 8-inch-wide connection mow/containment curb and 45-degree turn-down to loose fill curb rated at 4500 PSI. The contractor must construct and install 5–12 playground structures with swing bays and a 13+ workout station, both in accordance with ASTM standards. The contractor furnishes all materials, equipment, tools, labor, and incidentals and is responsible for accurate measurements throughout the project.
No contract value, contract term, set-aside program, incumbent contractor, or evaluation criteria are specified in the posted materials.
Opportunity text
Eager Park Improvement Project scope of work is as follows: Construct and install a 40 x 24 Hip Structure with a fabric roof and a steel frame, 12 entry height. All above-ground hardware, including bolts, clamps, and cables, must be stainless steel. (Spread footing will be used) Furnish and install pour-in-place 0.5-1.5mm granule size with aliphatic resin (Blue, Orange, Yellow, Red) Furnish and install Twelve (12) inches of Class two base Remove, haul, and dispose of existing Engineered Wood Fiber (EWF) and Natural Soil Furnish and install Engineered Wood Fiber (EWF) with Fabric at 12 in depth to include standard 25-50% compaction rate Construction and installation of 5-12 playground structures with swing bay using ASTM Standard Construction and installation of 13 & up Workout Station using ASTM standards Installation of a connection Mow/Containment curb 8 W+ 12 D 45OOPSI Installation of a 45 Degree turn- down to loose fill curb 4500PSI The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals, as required by the contract documents. Contractor will also be responsible for accurate measurements.
Files
| File | Type | Posted |
|---|---|---|
| Eager Park Improvement Project.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity