E-Rate Switching K-8 QQ and RR

Awarded State & local contract opportunity Posted

Solicitation number
RFP2025-091
State
Florida
Responses due

Opportunity facts

Jurisdiction
Points of contact

Updated .

About this opportunity

The School Board of St. Johns County School District, Florida, is soliciting proposals under RFP2025-091 to furnish and deliver edge and distribution network switching at 1Gbps, 10Gbps, and 40Gbps for two K-8 academies, Schools QQ and RR. Proposals were due December 18, 2025, and that date has passed. The procurement is funded through E-Rate Category Two, and the District requires proposers capable of both Billed Entity Applicant Reimbursement (BEAR) and Service Provider Invoicing (SPI) methods.

Minimum requirements include an up-to-date SPIN number and SPAC Form (USAC Form 473), at least ten years of business experience sourcing the specified hardware, written manufacturer authorization with current partner level or status for all proposed equipment, and three client references that successfully received E-Rate funding for similar services.

The scope covers specified Aruba-branded core switches, management modules, power supplies, optical modules, 10Gbps optics, stacking cables, and direct attach cables. Functionally equivalent substitutions are permitted with documented equivalency and corresponding manufacturer warranty support. All network electronics, modules, and connecting cables must be fully manageable through the District's existing HPE Intelligent Management Center (iMC) 7.x or current on-premises utilities. Pricing must be itemized per site, with services broken out as Internal Connections (IC), Basic Maintenance of Internal Connections (BMIC), and/or Managed Internal Broadband Services (MIBS). Prices must be F.O.B. destination, freight prepaid, and inclusive of labor, travel, and incidentals. Hardware must be delivered free of defect by April 15, 2026. Quantities are best estimates that the District may increase, reduce, or split, and it may transfer eligible equipment among schools under E-Rate Category 2 rules.

The contract term runs April 1, 2026 through September 30, 2027, with one additional year available by mutual agreement for unforeseen circumstances at the same pricing. Work is performed at St. Augustine and Ponte Vedra, Florida, in St. Johns County. Insurance requirements include Commercial General Liability of $1 million per occurrence and $2 million aggregate, statutory Workers' Compensation, and Motor Vehicle Liability of $1 million combined single limit.

Evaluation totals 100 points: Price of Eligible Products and Services (30), Firm's Approach and Methodology (28), Qualifications and Experience (27), and Organization and Effectiveness (15).

Questions were due November 19, 2025 at 12:00 p.m. EST, with responses issued by November 20, 2025 at 5:00 p.m. ET. Evaluation was anticipated for January and February 2026, with Board approval expected in February and March 2026. Subsequent file updates include Addendum 1 (November 20, 2025), a revised RFP Pricing Sheet (November 20, 2025), and Addendum 2 (December 18, 2025). The most recent file is a Letter of Intent posted February 2, 2026, which restates the scope without new response dates.

Opportunity text

1. The School Board is seeking proposals to furnish and deliver new edge and distribution network switching with 1Gbps/10Gbps/40Gbps capabilities for sites throughout SJCSD. See the RFP Pricing Sheet for the current list of schools and associated equipment. The quantities requested are SJCSD's best estimate and may be adjusted at the sole discretion of SJCSD. All items listed in the RFP Pricing Sheet must be priced by the Proposer. SJCSD reserves the right to increase or reduce quantities and buy some, all, or none of the listed equipment. Per FCC E-Rate transfer of equipment rules related to Category 2 equipment, SJCSD reserves the right to move or transfer any eligible equipment to any eligible school within SJCSD. All network electronics, modules and connecting cables (if any) included in the Proposer's proposal must be fully manageable, to include configuration, configuration backup, tuning, and reporting, by SJCSD's existing HPE Intelligent Management Center (iMC) 7.x (or current) on-premises network management utilities and environment.

Files

File Type Posted
RFP2025-091_Letter_of_Intent.pdf PDF
RFP2025-091_Addendum_2.pdf PDF
RFP2025-091_Addendum_1.pdf PDF
RFP2025-091_REVISED_RFP_Pricing_Sheet.xlsx XLSX spreadsheet
RFP2025-091_RFP_Pricing_Sheet.xlsx XLSX spreadsheet
RFP2025-091_E-Rate_Switching_K-8_QQ_and_RR.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors