DYS1902 biomass addl work final

Closed State & local contract opportunity Posted

Solicitation number
BD-27-1019-DCP08-ENR01-135206
State
Massachusetts
Responses due

Opportunity facts

NIGP code
UNSPSC code
Point of contact

Opportunity details come from commbuys.com. Updated .

About this opportunity

The Massachusetts Division of Capital Asset Management and Maintenance (DCAMM) is soliciting quotes on a Request for Quote for life cycle cost analysis and decarbonization advisory services for the woody biomass heating system at the Department of Youth Services' Judge John J. Connelly Youth Center in Boston, with a due date of November 6, 2026. The procurement is designated a Small Business Purchasing Program (SBPP) small procurement. SBPP-registered respondents meeting best value criteria receive award preference, and non-SBPP respondents are evaluated only if no SBPP bidder meets best value standards. The RFQ was issued under statewide contract PRF74.

The scope is a Facility Advisor role conducting a life cycle cost analysis and decarbonization analysis of the biomass boiler, installed in 2019 at the 55,800-square-foot facility, to determine its viability within the Commonwealth's decarbonization strategy. Work includes facilities commissioning focused on the boiler and capital planning that considers decarbonization goals. Deliverables are required in draft and final versions. Every improvement must include a carbon reduction or energy and water savings component unless the project manager directs otherwise. Respondents submit quotes electronically on COMMBUYS, with company information, a narrative for each task, special qualifications, and staffing plans with resumes. DCAMM provides reference documents, including boiler project files, as-builts, controls documentation, and utility data, as needed.

Pricing must be a not-to-exceed fee broken down by task and sub-task on the provided Fee Breakdown Table, with staffing roles and hourly rates. Permits, setup, quotes, travel, meals, lodging, and other miscellaneous charges are prohibited under PRF74 terms. Subcontractor costs carry a 5% maximum mark-up for overhead and profit.

The attached files also include a DCAMM Notice to Proceed to Wilson Engineering Services PC for additional work on the DYS Connelly Biomass Storage Expansion project, dated August 25, 2026, under MSA No. PRF74 Category 3. That notice caps the authorized cost at $9,500.00 and references a contractor proposal submitted June 24, 2026. Invoices go to the DCAMM Office of Finance and must reference Award No. DYS2301 - RTP - 3.

Files

File Type Posted
WES PRPOPOSAL.pdf PDF
DYS2103 WES NTP addl work final.pdf PDF
DYS2103 LCCA PRF74 Coverletter.pdf PDF