DSTT Switch Monitoring

Closed State & local contract opportunity Posted

Solicitation number
QQ 0011-26
State
Washington
Responses due

Opportunity facts

NIGP code
UNSPSC codes

Opportunity details come from biddingousa.com. Updated .

About this opportunity

The Central Puget Sound Transit Authority (Sound Transit) in Washington is seeking proposals for the installation of a switch monitoring system designed to serve the critical merge point where 1 Line and 2 Line intersect within the Downtown Seattle Transit Tunnel (DSTT). This procurement focuses on implementing monitoring technology at this strategically important junction to enhance operational oversight and safety. The proposal submission deadline is March 20, 2026, with the opportunity having been posted on March 3, 2026. Prospective vendors should be prepared to demonstrate expertise in transit infrastructure monitoring systems, switch control technology, and integration capabilities with existing transit operations. The evaluation criteria will likely emphasize technical competency, system reliability, cost-effectiveness, and the vendor's experience with similar critical transit infrastructure projects, though specific evaluation weightings and detailed requirements would be found in the full solicitation documents.

The solicitation document provided does not specify set-aside designations, disadvantaged business enterprise (DBE) requirements, or restrictions on eligible respondent types, indicating that interested vendors should consult the complete bid documentation for such details. No incumbent vendors, current contractors, or existing infrastructure integration requirements are detailed in the available information. Similarly, the budget range and potential award value have not been disclosed in this summary. Interested organizations should obtain the full Request for Proposals from Sound Transit to access comprehensive specifications, technical requirements, bonding and insurance requirements, and pricing structures necessary to develop a competitive proposal.

Opportunity text

Central Puget Sound Transit Authority (Sound Transit) is requesting Proposals for Social Media Monitoring tools, the purpose of which is to provide for the installation of a switch monitoring system for switches at the critical merge point of 1 Line and 2 Line in the Downtown Seattle Transit Tunnel (DSTT).

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity