Dory Lake Infrastructures Water Pump Station

Closed State & local contract opportunity Posted

Solicitation number
20250222b
State
Colorado
Responses due

Opportunity facts

Jurisdiction
UNSPSC codes
Show all 26

Opportunity details come from bidnetdirect.com. Updated .

About this opportunity

Gilpin County is seeking proposals for the Dory Lake Pump Replacement Project, a critical infrastructure upgrade to the existing water pump station that augments Ralston Creek flows. The Request for Proposal (RFP) solicits experienced firms specializing in municipal and commercial pumping infrastructure to replace the current submerged pump system with a new above-ground solution. The project scope includes installing a new submerged intake with an air backwash cleaning system, two new pumps, necessary piping, and a premanufactured pump enclosure along the shoreline. The proposal will be evaluated using a weighted criteria system: 10% for business/experience, 20% for project understanding, 20% for methodology/functionality, 20% for management plan/administration, and 30% for cost. The RFP was issued on February 26, 2024, with proposals due by March 14, 2024, at noon, and an anticipated notice of award on March 21, 2024. The project start date is planned for April 14, 2024, with the primary objective of upgrading the water pump infrastructure to ensure reliable water flow management and meet state water rights obligations.

The RFP does not explicitly mention specific set-aside designations or restrictions for disadvantaged enterprises. The contract will be funded by Gilpin County, with the county reserving the right to reject any proposals that do not meet the specified requirements. While no incumbent vendors are specifically identified, the project involves replacing existing submerged pumps and electrical equipment with a new system that will integrate with the current discharge line. The procurement emphasizes a comprehensive solution that goes beyond simple equipment replacement, focusing on improved functionality such as the air backwash cleaning system that eliminates the need for diver-based maintenance. Although a specific budget range is not provided, the comprehensive nature of the project and the technical specifications suggest a significant capital investment in municipal infrastructure. Potential bidders should be prepared to demonstrate not just competitive pricing, but also technical expertise, project management capabilities, and a thorough understanding of the unique challenges associated with water infrastructure upgrades in a lake environment.

Opportunity text

Gilpin County operates a pump station in Dory Lake to augment Ralston Creek flows, when determined by the State Water Commission, out of Dory Lake and into nearby Ralston Creek to maintain obligations to senior water rights. The current system is at risk of failing due to the submerged pumps in Dory Lake nearing the end of their life cycle. Instead of replacing the submerged pumps in-kind, the new construction will include installing a new submerged intake to include an air backwash cleaning system to allow for cleaning without divers. Two new pumps and necessary piping will be installed along the shoreline within a premanufactured pump enclosure. The new intake from the lake will be plumbed into the premanufactured pump enclosure and the outlet will tie into the existing discharge line. Removal and upgrading of electrical fixtures will be required.

Files

File Type Posted
Dory Lake Pump Replacement RFP (w docs).pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors