Dock Replacement, Lake of the Ozarks State Park, Camp Rising Sun
Closed State & local contract opportunity Posted
- Solicitation number
- IFB22001167
- State
- Missouri
- Responses due
Opportunity facts
- Jurisdiction
- UNSPSC code
- Point of contact
-
- Jeffrey Stone jeff.stone@dnr.mo.gov (573) 522-3299
Opportunity details come from webprocure.proactiscloud.com. Updated .
About this opportunity
The Missouri Department of Natural Resources has issued an Invitation for Bid (IFB22001167) for a dock replacement project at Lake of the Ozarks State Park's Camp Rising Sun. The procurement specifically requires the removal and replacement of three docks, with critical technical requirements mandating that the contractor or subcontractor must be an Ameren-approved dock builder. The contractor will be responsible for providing comprehensive documentation including all necessary drawings, specifications, documentation, and reporting documents required to obtain permits from Ameren Missouri. The project has strict installation deadlines, with docks required to be completed no later than April 15, 2022, and a full contract period extending one year from the contract's effective date. A mandatory pre-bid tour was scheduled for January 24, 2022, at 11:00 AM, with vendors required to notify the Department of Natural Resources of their tour participation by January 21, 2022, at 11:00 AM. The original bid submission deadline was set for January 28, 2022, with the bid period running from December 31, 2021, to January 31, 2022. Vendors must submit their bids through the MissouriBUYS system or as a hard copy if allowed by the solicitation, and must complete and sign Exhibit A and any other applicable exhibits.
The solicitation does not specify any set-aside designations or restrictions on responding organizations, indicating the bid is open to all qualified vendors. No incumbent vendors or current contractors are identified in the documentation, and there are no explicit details about existing infrastructure requiring integration. The solicitation does not provide an estimated total contract value or specific budget range for the dock replacement project. Payment terms are established as Net 45 Days, with delivery terms defined as Free On Board Destination. The procurement is specifically for dock replacement at the Lake of the Ozarks State Park's Camp Rising Sun location, situated in Cape Girardeau County, Missouri. While the documents do not outline specific evaluation criteria beyond the Ameren-approved dock builder requirement, vendors will likely be assessed on their technical capability to complete the dock installation by the specified deadline, provide required documentation, and meet the project's technical specifications. The Missouri Department of Natural Resources will serve as the primary contracting agency for this procurement.
Opportunity text
The removal and replacement of three (3) docks located at Lake of the Ozarks Camp Rising Sun. The contractor or the contractor's subcontractor must be an Ameren approved dock builder. The Contractor shall provide all drawings, specifications documentation, and reporting documents as required by Ameren Missouri in order to obtain the necessary permits for dock construction. The contractor shall understand and agree that docks must be installed no later than April 15, 2022. Contract period: Effective date of contract through one (1) year. JS Addendum 01: tour date change 01/24/2022 and bid return date change 01/28/2022 js. Addendum 02: changed the participation notification date prior to tour, 01/21/2022 by 11:00AM js
Files
Show all 37
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity