DOC power supply replacement project

Closed State & local contract opportunity Posted

Solicitation number
Doc761513
State
District of Columbia
Responses due

Opportunity facts

NIGP code
Points of contact

Opportunity details come from contracts.ocp.dc.gov. Updated .

About this opportunity

The District of Columbia Department of Corrections (DOC) is seeking competitive proposals for a comprehensive Power Supply Replacement Project, with responses due on March 6, 2025. This procurement opportunity involves a critical infrastructure upgrade focused on replacing existing power supply systems within DOC facilities. Potential bidders must demonstrate extensive expertise in electrical systems engineering, infrastructure modernization, and institutional power grid retrofitting. Qualifications will likely include proven experience with government facility power infrastructure, demonstrable technical capabilities, and a track record of successful large-scale electrical system replacements. The project appears to require detailed technical proposals demonstrating comprehensive understanding of institutional power requirements, proposed replacement methodologies, implementation strategies, and potential disruption mitigation plans. All interested vendors must submit comprehensive documentation by the March 6, 2025 deadline, with potential for pre-submission questions and clarifications during the intervening period.

While specific set-aside designations are not explicitly detailed in the provided information, government contracts of this nature often have provisions for disadvantaged business enterprises or local vendor preferences. The power supply replacement project likely represents a significant capital investment, potentially ranging from several hundred thousand to multiple million dollars depending on facility scope and complexity. Vendors should anticipate potential requirements for demonstrated financial stability, appropriate licensing, and specialized electrical infrastructure credentials. The contract may involve multiple phases of assessment, design, procurement, and implementation of new power supply systems. Potential bidders should be prepared to provide comprehensive documentation of technical capabilities, previous institutional infrastructure projects, and detailed implementation strategies that minimize operational disruptions during power system transitions.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity