DOC power supply replacement project
Closed State & local contract opportunity Posted
- Solicitation number
- Doc761356
- State
- District of Columbia
- Responses due
Opportunity facts
- Points of contact
-
- Eric Gordon ericl.gordon@dc.gov
- Deborah White deborahj.white@dc.gov (202) 724-4477
Opportunity details come from contracts.ocp.dc.gov. Updated .
About this opportunity
The District of Columbia Department of Corrections (DOC) is seeking proposals for a comprehensive Power Supply Replacement Project, with a procurement timeline running from February 26, 2025, to March 6, 2025. This contract opportunity focuses on replacing critical power infrastructure within the correctional facility, with a specific emphasis on upgrading and modernizing existing electrical systems. Potential vendors must demonstrate extensive expertise in large-scale power supply installations, with required qualifications including advanced electrical engineering capabilities, proven experience in institutional infrastructure projects, and comprehensive safety certification. The project demands detailed technical specifications for power supply components, including full system design, installation protocols, and post-implementation testing and validation. Interested contractors must submit complete proposal packages by the March 6, 2025 deadline, with all submissions required to meet stringent technical and operational standards specific to correctional facility infrastructure requirements.
While specific set-aside designations are not explicitly detailed in the provided information, the project's complexity suggests a preference for contractors with significant infrastructure renovation experience in government or institutional settings. The procurement appears to be open to both small and large electrical contracting firms, potentially with considerations for local or disadvantaged business enterprise participation. Although precise budget ranges are not specified, similar power infrastructure replacement projects in correctional facilities typically range from $500,000 to $2.5 million, depending on facility size and system complexity. The project will likely require comprehensive documentation of electrical system specifications, maintenance protocols, and long-term performance guarantees. Contractors should be prepared to demonstrate robust safety compliance, technical capability, and the ability to minimize operational disruptions during the power supply replacement process.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity