Distribution Getaway Duct Bank Bore at East Village subst
Open State & local contract opportunity Posted
- Solicitation number
- IFB 6100 CLMC1105
- State
- Texas
- Responses due
Opportunity facts
- Jurisdictions
- Points of contact
-
- Olga Jimenez olga.jimenez@austintexas.gov (512) 974-7988
- Francisco Gonzalez francisco.gonzalez@austinenergy.com (512) 972-8252
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of Austin, Austin Energy is requesting bids on construction of a distribution getaway duct bank bore at the East Village Substation under IFB CLMC1105, with bids due July 9, 2026. The Austin Energy MBE/WBE Procurement Program applies; bidders must submit an MBE/WBE Compliance Plan with their bid or face rejection.
The scope comprises approximately 342 linear feet of 36-inch jack and bore with 12-inch carrier pipes grouted within the casing pipe in groundwater conditions; 386 linear feet of 12-inch open cut duct bank; 79 linear feet of 2-inch open cut duct bank; two 12-by-12-foot manholes; and erosion and sedimentation control and revegetation. Austin Energy will install conductors at project completion. Geotechnical reports indicate groundwater at 12 feet below surface grade, with subsurface conditions of Alluvium, clay, sand, and shale materials to depths of 60 feet. The project site is at 4605 E. Howard Lane, Austin, Texas (CIP ID 13247.070).
Substantial completion is required within ninety working days after Notice to Proceed, with final completion within thirty working days thereafter. Liquidated damages are $1,330 per calendar day for failure to substantially complete and $770 per calendar day for final completion delay. Bid prices exclude sales tax; the City provides a Sales Tax Exemption Certificate. Minimum wage rates comply with Department of Labor standards for Building Construction and Heavy and Highway Trades or the City of Austin Ordinance, whichever is higher. All bids require a 5% bid guaranty and 100% performance and payment bonds. Award goes to the lowest responsible bidder. A non-mandatory pre-bid webinar and teleconference is scheduled for July 29, 2025 at 10:00 AM. The City reserves the right to reject any or all bids.
Opportunity text
The Work shall include furnishing all tools, labor, materials, equipment, and miscellaneous items necessary for the complete construction of approximately 342 linear foot 36-inch jack and bore with 12-5 inch carrier pipes (grouted within the casing pipe) in ground water conditions. The work also includes 386 linear feet of 12-5 inch open cut duct bank, 79 linear feet of 2-5 inch open cut duct bank, two 12x12 manholes and typical erosion and sedimentation control and revegetation. Austin Energy will install the conductors at the project completion.
Files
| File | Type | Posted |
|---|---|---|
| IFB_6100_CLMC1105_MWDBE_PAC_v1.pdf | ||
| IFB_6100_CLMC1105_BID_DOC_v1 (1).pdf | ||
| IFB_6100_CLMC1105_BID_DOC_v1.pdf |