Design/Build of 2 Storage Facilities
Open State & local contract opportunity Posted
- Solicitation number
- 270007
- State
- Connecticut
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Tara Cummins procurement@westhartfordct.gov (860) 561-7472
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The Town of West Hartford, Connecticut is soliciting design-build proposals for planning, design, engineering, and construction of two storage facilities under Bid #270007, with electronic bids due December 3, 2026 at 2:00 p.m. EST. The bid packet cites a Connecticut state-law participation requirement: 25% of state-funded work must go to Department of Administrative Services (DAS) certified small and minority-owned businesses, with an additional 25% designated for DAS-certified minority, women, and/or disabled-owned businesses.
The scope covers a Police Department vehicle storage facility at 12 Brixton Street and a Public Works equipment and material storage facility at 17 Brixton Street, both at the West Hartford Public Works Municipal Complex. Design requirements emphasize security, durability, energy efficiency, and low maintenance. Work is phased, with the Police facility (Phase 1) completed before the Public Works facility (Phase 2), and final completion is due September 1, 2027. Liquidated damages are $500 per calendar day for failure to meet substantial completion.
Bidders must post a 10% bid surety by bid bond, certified check, or treasurer's check and hold bids for 90 days after opening. Contracts exceeding $50,000 require performance, labor, and material bonds in the full estimated total base bid. Required insurance includes commercial general liability of $1 million per occurrence and $2 million aggregate, umbrella or excess liability of $5 million per occurrence and $10 million aggregate, professional environmental liability of $2 million, and contractor's pollution liability of $2 million, with the Town named as additional insured where applicable. Connecticut prevailing wage rates apply, set as of October 27, 2026 and adjusted each July 1. Contractors must obtain an Affirmative Action Plan approved by the Connecticut Commission on Human Rights and Opportunities before construction begins.
The Town will award to the best-value bidder within the bidding documents' requirements and available funds. The pre-bid conference at 17 Brixton Street on November 17, 2026 at 10:00 a.m. EST and the written-question deadline of November 22, 2026 through the Town's Bidding Portal have both passed.
Opportunity text
The Town of West Hartford is soliciting proposals from qualified Design-Build (D-B) teams to provide planning, design, engineering and construction services for two new storage facilities located at West Hartford Public Works Municipal Complex. 1. A vehicle storage facility for the Police Department (PD) at 12 Brixton Street. and 2. A Public Works (PW) equipment and material storage facility at 17 Brixton Street. The purpose of this project is to design and construct two storage facilities with security, durability, energy-efficiency and low maintenance as the underlining requirements to improve operational efficiencies and readiness.
Files
| File | Type | Posted |
|---|---|---|
| 270007 Bid Packet.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity