Danville North Branch Canal Trail LeveeTrail

Open State & local contract opportunity Posted

Solicitation number
111599
State
Pennsylvania
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The Pennsylvania Department of Transportation (PennDOT) is requesting sealed bids for trail enhancement and reconstruction of the Danville North Branch Canal Trail (Levee Top Trail) in Danville Borough, Montour County, with bids due December 3, 2026 at 11:00 a.m. at the Commonwealth Keystone Building in Harrisburg. This is a federally-funded municipal project with a 0% DBE set-aside and a 2.00% structure work requirement; prevailing wage rates apply.

The scope spans 5,930.54 linear feet (1.123 miles) from the intersection of Levee Top Trail and East Market Street to Grand Street. Work includes superpave asphalt base and wearing courses, curb and sidewalk construction, trail surface upgrades, swing gate installation, excavation (460 cubic yards), subbase installation (6,063 square yards), geotextile placement (6,252 square yards), and miscellaneous items including boulders and trash receptacles. Contractors must comply with Buy America requirements, erosion and sediment control standards, post-construction stormwater management, traffic control maintenance, and material certification requirements detailed in the special provisions.

The estimated project cost range is $500,000 to $999,999.99. Pre-qualification is required; no pre-bid meeting is scheduled. Bidders must submit the Worker Protection and Investment Certification (BOP-2201) within seven calendar days of bid opening. Construction must begin by March 11, 2027, with no work permitted on Sundays or designated holidays, and completion is required by September 13, 2027. The anticipated Notice to Proceed is March 3, 2027. The bid package contains extensive technical specifications for superpave asphalt mixtures, infiltration testing, and stormwater performance standards.

Opportunity text

The description and location of the project are as follows: This work is enhancing the paved pedestrian and bicycle trail top of the Danville North Branch Canal trail (Levee Top Trail) with superpave asphalt mixture, base and wearing courses, curb and sidewalk upgrades, trail surface upgrades, swing gate installation, and other miscellaneous construction all within a length of 5930.54 Linear Feet (1.123 Miles) as indicated on the approved drawings included in the bid package for Danville North Branch Canal Trail, Section 63E at the intersection of Levee Top Trail and East Market Street to the intersection of Levee Top Trail and Grand Street in Danville Borough, Montour County.

Files

File Type Posted
848289padot111599.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors