Dallas Salmon Wastewater Treatment Plant - Miscellaneous Improvements

Closed State & local contract opportunity Posted

Solicitation number
WW2103C
State
Texas
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The City of Dallas is requesting bids for miscellaneous improvements at the Dallas Salmon Wastewater Treatment Plant, with proposals due September 23, 2026.

The scope encompasses dewatering and pressure-wash cleaning of all aeration basins (design flows 4.5 MGD average, 12 MGD at 2-hour peak) in preparation for fiberglass-reinforced-plastic launder replacement; replacement of existing FRP launders at inlet and outlet sides with T-304 stainless steel units; and installation of launder edge fall protection. The project also includes dewatering and cleaning of the clarifier distribution splitter box prior to stop gate replacement; replacement of existing stop gates with new 304 stainless steel slide gates; addition of cantilevered grating platform and handrail for access to both sides of the new gates; modification of structural grating and supports to accommodate the new slide gates; replacement of the existing belt press wash water booster pump system with new pumps, motors, valves, DI piping, and PVC piping installed on a prefabricated carbon steel fusion-bonded epoxy suction pump skid with engineered pipe supports; and replacement of Switchboard DS-2 within the automatic transfer switch and associated bus duct modifications and related electrical improvements.

The facility is located in Galveston County, Texas. No estimated contract value, contract term, evaluation criteria, pre-bid meeting, question deadline, or incumbent information is provided in the source material.

Opportunity text

The project consists of the following scope of work: Dewatering and pressure wash cleaning of all Aeration Basins in preparation of FRP launder replacement. Replacement of existing FRP Launders at the inlet and outlet sides of Aeration Basins with new T-304 Stainless Steel launders. Installation of launder edge fall protection system. The design flows for each of the Aeration Basins are 4.5 MGD on average and 12 MGD at 2-hour peak flow. Dewatering and pressure wash cleaning of Clarifier Distribution Splitter Box in preparation for Stop Gate replacement. Replacement of existing Stop Gates located at the Clarifier Distribution Splitter Box with new 304 Stainless Steel Slide Gates. Addition of new cantilevered grating platform and handrail to Clarifier Distribution Box for access to both sides of the gates. Modification to structural grating and structural grating supports on top of Clarifier Distribution Splitter Box to clear new self-contained Slide Gates. Replacement of existing Belt Press Wash Water Booster Pump System, which includes new pumps, motors, valves, DI piping and PVC piping. Installation of new items on a pre-fabricated carbon steel fusion bonded epoxy coating suction pump skid and new engineered pipe supports. Replacement of Switchboard DS-2 within the ATS and Bus Duct modifications and other related electrical improvements.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors