Dallas Salmon Wastewater Treatment Plant - Influent Lift Station Rehabilitation
Closed State & local contract opportunity Posted
- Solicitation number
- WW2103B
- State
- Texas
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Brent W. Nicholas bnicholas@ardurra.com (346) 249-8679
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Galveston County is requesting bids on rehabilitation of the Dallas Salmon Wastewater Treatment Plant influent lift station, with proposals due September 23, 2026.
The scope encompasses bypass pumping system installation on influent gravity raw sewage collection sewers with temporary SCADA integration; removal, storage, and reinstallation of existing submersible pumps; blast and pressure-wash cleaning of all wet wells; dewatering and drying; inspection and repair of pump base elbows; reinforcing steel installation and lower concrete wall buildup; upper concrete wall and roof ceiling repair; H2S corrosion-resistant coating system installation; new flood-resistant access hatches and raised vent assemblies positioned above the 500-year flood plain; new 316L stainless steel piping, guide rails, support brackets, and engineered pipe supports; new gusset plates and tie rods on pump riser piping couplings and 30-inch force main header (three locations); blast and paint finishing on above-ground piping, valves, and monorail structural support with stencil labeling; and new level instrumentation, waterproofing, and associated electrical and instrumentation work.
No estimated contract value, contract term, incumbent contractor, evaluation criteria, pre-bid meeting, site visit, question deadline, or set-aside program is identified in the posting.
Opportunity text
The project consists of the following scope of work: Installation of bypass pumping systems as required on the influent gravity raw sewage collection sewers. Connection to existing SCADA system for temporary equipment notification. Removal of existing submersible pumps and proper storage. Reinstall submersible pumps and connect electrical cables upon completion of rehabilitation work. Blast cleaning and pressure wash cleaning of all wet wells in preparation for structural repair methods. Dewatering and drying of existing wet wells. Inspect existing pump base elbows. Installation of additional reinforcing steel and buildup of lower concrete walls. Repair of upper concrete walls and roof ceiling surface. Installation of a coating system to prevent future H2S corrosion reactions. Installation of new flood resistant access hatches at the JB and ILS. Also install new vent assemblies raised to be protected from the current 500-year flood plain. Installation of new wet well type 316L stainless steel piping, guide rails, guide rail support brackets, new engineered pipe supports, etc. Installation of new gusset plates and tie rods on all pump riser piping couplings and on the 30-inch force main header; 3 places. Blast and paint all above ground piping and valves and paint with stencil label. Existing monorail structural support and beams to be blasted and repainted. New level instrumentation and water proofing details with all associated electrical and instrumentation work.