The Maryland State Highway Administration (SHA) is soliciting lump sum bids for the replacement of 23 toilets at the I-95 Welcome Center restrooms located in Savage, Maryland. The contract requires the removal and salvage of 11 existing toilets from the I-95 Welcome Center North and 12 existing toilets from the I-95 Welcome Center South. The selected contractor will be responsible for reviewing site conditions, removing and disposing of the existing toilets, and installing the new toilets. The work must be completed during normal business hours, with the contractor providing a construction schedule for approval. The contractor must be licensed and insured to perform work in the state of Maryland and use best practices established in the construction industry to perform the work to the satisfaction of the SHA Office of Maintenance.
The solicitation does not provide any specific pricing terms, set-asides, or funding information. However, it states that any additional costs incurred must be agreed upon between the contractor and the Contract Manager before work can proceed. The project is located within Howard County and the town of Leonardtown, and the successful contractor must use best practices established in the construction industry to perform the work to the satisfaction of the SHA Office of Maintenance. The solicitation does not specify any incumbent vendors or current contractors, and there is no information provided about any existing infrastructure or technology that requires integration.
Opportunity text
This Contract provides for the Replacement of 23 Toilets at I-95's North & South, Welcome Centers, 8202 Route-95, Laurel, Maryland 20723. Remove and salvage 11 existing toilets from I-95 Welcome Center, North, and 12 existing toilets from I-95 Welcome Center, South. The contractor shall undertake the following task: The Contractor shall review site conditions before beginning any work. He shall compare his/her bid with site conditions and report any variations to the Contract Manager. Upon affirmation of site conditions, Contractor shall proceed to install the new toilets. The contractor shall remove the existing toilets. The selected contractor shall temporally cap the toilet floor drains and protect the supply lines to the toilet. The contractor shall remove and dispose of the toilets. Remove wax rings and all flooring materials down to a clean, clear floor finish. Once the toilets have been removed, the contractor shall notify the Contract Manager to review the site. Upon review of the floor by the Contract Manager, he/she shall direct the contractor to proceed. All modifications to the Scope of Work shall be documented in writing and provided to the Contract Manager. If additional Cost has been incurred, an agreement must be created between the Contractor and the Contracting Manager before work can proceed. The successful contractor shall furnish all supervision, labor, tools, transportation, equipment, hoist/crane, and materials necessary to perform all work in accordance with this specification and scope of work in the manner called for, and to the satisfaction of the State Highway Administration Office of Maintenance (OOM). Vendor is to use best practices established in the construction industry to perform this work. Contractor shall be licensed and insured to perform work in the State of Maryland. Work associated with this project shall not interfere with the maintenance facilities work under emergency summer or winter operations. Water supply shutdown preparation: Shall be coordinated with the Contract Manager. Work Schedule: Perform all work during normal work hours. Contractor shall provide to the Contract Manager a Construction Schedule for his/her approval. Contractor may request through the Contract Manager for additional hours in the day or weekend, which must be approved in writing. Cleanup: Thoroughly clean the work area each day; disposing of debris and materials responsibly. Final cleaning shall be reviewed by the Contract Manager and signed off/approved before Final Payment is approved. The Maryland State Highway Administration (SHA) is soliciting lump sum bids for removal and salvage of 12 existing toilets at I-95 Welcome Center South Side and 11 existing toilets at I-95 Welcome Center North side Restrooms Located in Savage Maryland.
Files
| File | Type | Posted |
|---|---|---|
| D7070091 I-95 North-South Restrooms - Toilet Replacement.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity