About this opportunity
The State of Vermont, through Bennington County, is procuring construction services for culvert replacement and related infrastructure work on Lazy Mill Road in Stannard, Vermont. This project requires the removal of an existing 72-inch culvert and installation of a three-sided rigid frame structure with stone infill, along with construction of headwalls, wingwalls, guardrail installation, road reconstruction, and stream bank restoration. All work must be completed in accordance with the detailed bid plans provided by the procuring agency. The solicitation was posted on February 3, 2026, with a proposal submission deadline of March 4, 2026. Interested contractors should review the complete bid documents to understand all technical specifications, performance requirements, and project deliverables. While specific evaluation criteria were not detailed in the available information, standard construction procurement practices typically assess contractor qualifications, experience with similar projects, proposed methodology, timeline, and cost proposals.
The contract opportunity documentation provided does not specify set-aside designations, disadvantaged business enterprise restrictions, or preferences for particular contractor classifications. No incumbent vendors or current contractors were identified in the solicitation materials. Similarly, the available information does not reference existing infrastructure or technology systems requiring integration beyond the physical restoration work described. The contract value or budget range for this culvert replacement project was not disclosed in the posted opportunity details. Prospective bidders are advised to contact the State of Vermont or Bennington County directly to obtain complete bid specifications, any applicable bonding requirements, insurance requirements, and clarification on budgetary parameters for proposal preparation.
Opportunity text
The Project includes the following work: Removal of an existing 72" culvert and the installation of a three-sided rigid frame structure with stone infill, headwalls, wingwalls, guardrail, road reconstruction, stream bank restoration, and all associated work as outlined in the bid plans.