Culvert Replacement- Culvert Repair and Retaining Wall Replacement and Related Work at Three Locations
Closed State & local contract opportunity Posted
- Solicitation number
- 616375-136648
- State
- Massachusetts
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The Worcester County, Massachusetts Department of Public Works (or relevant highway authority) is requesting bids on culvert replacement, retaining wall replacement, and related work at three locations, with proposals due October 20, 2026. Bidders must hold pre-qualification from the Massachusetts Department of Transportation (MassDOT) in the HIGHWAY-CONSTRUCTION or BRIDGE-CULVERT category — a mandatory eligibility gate. This is a Federal Aid Project.
The primary scope at Pleasant Street and Colburn Street involves replacing a temporary 36-inch corrugated plastic pipe (installed as emergency repair after September 2023 flood damage) with a permanent 8.33 x 7 box culvert and headwalls (Bridge No. L-08-053). The project includes channel restoration downstream of the culvert, channel realignment, and creation of flood storage area to mitigate downstream flooding to residential condominiums. Work at the other two locations is referenced but detailed specifications are not provided in the source.
The source does not specify estimated contract value, contract term, place of performance beyond the three locations, incumbent contractor, evaluation criteria, or procurement timeline details beyond the October 20 proposal due date.
Opportunity text
At Pleasant Street and Colburn Street, the project consists of replacing the temporary 36 corrugated plastic pipe, installed as an emergency replacement of the previous 5x 3 box culvert that collapsed during the floods in September 2023. An 8.33 x 7 box culvert and headwalls (Bridge No. L-08-053) will be installed to replace the temporary culvert and meet the required hydraulic opening to the maximum extent practicable. Additionally, this project will include the restoration of the channel downstream of the culvert. The channel will be realigned, and a flood storage area will be provided to mitigate flooding concerns to the condos further downstream. See attached. Bidders must be pre-qualified by the Department in the HIGHWAY-CONSTRUCTION or BRIDGE-CULVERT categories to bid. Federal Aid Project.