CPR, New Airport Traffic Control Tower
Closed State & local contract opportunity Posted
- Solicitation number
- 10024593.00
- State
- Wyoming
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- David R. Woods david.woods@woolpert.com (678) 859-8431
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of Cheyenne, Wyoming is requesting bids for construction of a new Airport Traffic Control Tower (ATCT) and Base Building Facility at Cheyenne Regional Airport, with bids due July 14, 2026.
The base bid scope encompasses an 8-sided, 440-square-foot ATCT cab with 360-degree visibility positioned atop a 127-foot tall shaft, supported by an approximately 2,700-gross-square-foot base building. Work includes deep foundations, grade beams, concrete slabs, load-bearing cold-formed metal framing, masonry, interior finishes, fire protection systems, mechanical systems, electrical systems, and telecommunications systems. Bid Alternate 1 adds fiber optic cabling and duct bank installation to Radar Site ASR8. Contractors must comply with applicable building codes, FAA regulations, and airport design standards. The bidding documents contain detailed technical specifications for structural, mechanical, electrical, and telecommunications systems integration specific to the tower's operational requirements and site conditions.
No set-asides, preference programs, or contract value are identified in the source.
Opportunity text
Base Bid: Project consists of a New Airport Traffic Control Tower (ATCT) & Base Building Facility at CPR. The ATCT Cab is an 8-sided, approximate 440 square foot space with a 360-degree view sitting on top of an approximate 127 tall shaft. The supporting Base Building is approximately 2,700 gross square feet. The work generally includes deep foundations, grade beams, concrete slabs, load bearing cold formed metal framing, masonry, interior finishes, fire protection systems, mechanical systems, electrical systems and Telecommunications systems. Bid Alternate 1 Fiber Optic Cabling and Duct Bank to Radar Site ASR8.
Files
| File | Type | Posted |
|---|---|---|
| 10024593.00.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity