Continental Country Club WTP No. 1 Decommissioning
Closed State & local contract opportunity Posted
- Solicitation number
- ITB-2025-12-0-2025/RS
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
Opportunity details come from network.demandstar.com. Updated .
About this opportunity
The state and local contract opportunity for the Continental Country Club WTP No. 1 Decommissioning project is a comprehensive infrastructure procurement issued by Sumter County, Florida, focused on water treatment plant infrastructure modifications. The project requires a qualified contractor to furnish, deliver, and install a comprehensive set of technical components, including a new pressure/flow control valve, control valve controller, flow meter, pressure gauges, and 6-inch ductile iron pipe. Specific technical requirements include control panel upgrades, system integration, and complete demolition of existing infrastructure such as the valve assembly, flow meter, well pump, piping, and potable supply well. The procurement was posted on August 22, 2025, with a proposal submission deadline of September 24, 2025, indicating a relatively tight timeline for potential bidders. Contractors will need to demonstrate technical expertise in water treatment infrastructure, municipal utility systems, and complex infrastructure decommissioning processes. The scope of work demands precise engineering capabilities, specialized equipment, and demonstrated experience in municipal utility infrastructure projects.
While specific set-aside designations are not explicitly detailed in the provided documentation, the project appears to be a standard municipal infrastructure contract open to qualified contractors with appropriate technical capabilities. The project is located in Sumter County, Florida, suggesting potential opportunities for local or regional contractors familiar with the area's municipal infrastructure systems. No specific incumbent vendors or current contractors are mentioned in the available information. The contract does not specify a precise budget range or award value, which would typically be clarified in the full bid documentation. Potential bidders should anticipate demonstrating comprehensive technical qualifications, safety protocols, project management expertise, and the ability to integrate new infrastructure components with existing municipal water treatment systems. Interested contractors would likely need to provide detailed technical proposals, demonstrating their capacity to execute the complex decommissioning and infrastructure upgrade requirements specified in the contract documents.
Opportunity text
Furnish, delivering, and installing all materials, equipment, and services, including labor for the work of installing a new pressure/flow control valve, control valve controller, flow meter, pressure gauges and 6" ductile iron pipe, along with the required control panel upgrades and system integration. Demolition of the existing valve assembly, flow meter, well pump, piping, and potable supply well per the contract documents.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity