Construction of Parks Creek Reservoir and Dam Project
Closed State & local contract opportunity Posted
- Solicitation number
- PE-67860-NONST-2025-000000010
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- UNSPSC codes
- Point of contact
-
- Priscilla Murphy pmurphy@cityofjeffersonga.com (706) 367-5121
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The City of Jefferson, Georgia is soliciting sealed bids for the construction of the Parks Creek Reservoir and Dam Project, a comprehensive water infrastructure initiative in unincorporated Jackson County. The project encompasses the design and construction of an earthen embankment dam approximately 97 feet in height with a crest length of 1,170 feet, requiring approximately 500,000 cubic yards of zoned earth fill, along with spillway systems including a 91-foot-tall reinforced concrete riser and a 420-foot-long prestressed concrete cylinder pipe outlet, an auxiliary spillway with earth-cut vegetated channel, raw water pumping facilities, raw water pipelines (8,300 linear feet from the North Oconee River intake to the reservoir and 1,800 linear feet within the reservoir), internal drainage systems (chimney drain, trench drain, and blanket drain), permanent vegetation establishment, and erosion protection measures. Sealed bids must be received by 2:00 p.m. local time on Wednesday, September 10th, 2025, at City Hall, 147 Athens Street, Jefferson, GA 30549, with public opening and bid price announcement to follow immediately thereafter. A mandatory pre-bid conference and site visit will be held on August 13, 2025, at 10:00 a.m. EST at the City of Jefferson Civic Center, 65 Kissam Street, Jefferson, GA 30549; failure to attend will result in automatic disqualification. Each bid must be accompanied by a 5 percent bid bond payable to the City and issued by a Corporate Surety authorized to do business in Georgia, or alternatively, a letter of credit or bank guaranteed check from a local bank. The successful bidder must furnish Performance and Payment Bonds each in the amount of 100 percent of the bid. Complete bid documents, plans, and supporting technical data are available for viewing at no charge by appointment at Schnabel Engineering, LLC, 6445 Shiloh Road, Suite A, Alpharetta, Georgia 30005, with paper and electronic copies available for purchase at $500.00 (non-refundable) or electronic copies only for $200.00.
This procurement is restricted to five pre-qualified prime contractors only: Phillips Heavy, Inc., North Georgia Concrete, Inc., Thalle Construction Company, Inc., Crowder Construction Company, and Wright Brothers Contracting, Inc. No set-aside designations for disadvantaged enterprises have been identified in the available documentation. Bids shall be submitted in triplicate, sealed, and mailed or hand-delivered to City Manager Priscilla Murphy prior to the bid opening date and time. All communications regarding the Invitation to Bid must be in writing and directed only to the Issuing Officers, Jonathan T. Dean, PE, or Brett T. Dodd, PE, with no other communication permitted between bidders and City employees except during the pre-bid conference. The City reserves the right to reject any or all bids, waive informalities and technicalities, disqualify bidders for failure to attend the pre-bid conference, and reject bids from entities deemed not responsible or not in the best interest of the project. No specific award value or budget range has been disclosed in the available procurement documentation.
Opportunity text
BID ADVERTISEMENT Construction of Parks Creek Reservoir and Dam Project The City of Jefferson (the ¿City¿) is soliciting sealed bids for furnishing all materials, labor, tools, equipment, and appurtenances necessary for the construction of the Parks Creek Reservoir and Dam Project. Sealed bids will be received by the City at the City of Jefferson City Hall located at 147 Athens Street, Jefferson, GA 30549, until 2:00 p.m., local time, on Wednesday, September 10th, 2025, and then at said office publicly opened and the bid price read aloud. The work is generally described as follows: The construction of an earthen embankment dam, spillway systems, raw water pumping facilities, and raw water pipelines. The proposed dam will be located on Parks Creek in unincorporated Jackson County, Georgia approximately 4-¾ miles northeast of Jefferson, Georgia. The proposed reservoir will be supplemented by pumping water from the North Oconee River. Approximately 8,300 linear feet of raw water main will be required from the intake and pump station located at the North Oconee River to the proposed reservoir. A raw water intake and pump station will also be located at the proposed reservoir to withdraw water. Approximately 1,800 linear feet of raw water main will be required from the reservoir intake within the reservoir to a future water treatment plant on the southwest side of the dam. The proposed dam will have a maximum height of approximately 97 feet above the existing stream channel and a crest length of approximately 1,170 feet. The construction of this embankment is expected to require on the order of 500,000 cubic yards of zoned earth fill. The earthen embankment dam will also include the construction of an internal drainage system consisting of a chimney drain, trench drain and blanket drain. The principal spillway will consist of a 91-foot-tall reinforced concrete riser, 4 feet by 7-½ feet in interior plan dimensions, with a 420-foot-long prestressed concrete cylinder
Files
| File | Type | Posted |
|---|---|---|
| Parks Creek Dam and Reservoir.doc | DOC document |
On GovTribe