Conservation/SLD/Wehle - Insulation Replacement

Closed State & local contract opportunity Posted

Solicitation number
SRC0000037502
State
Alabama
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from alabamabuys.gov. Updated .

About this opportunity

The State of Alabama is soliciting all-or-none bids for insulation removal and replacement at three buildings at Wehle Nature Center in Midway, Alabama, with bids due November 6, 2026. The procurement is a Quick Quote under the Office of the Chief Procurement Officer's standard terms, and vendors must be registered in Alabama Buys and submit responses electronically through that platform. No set-aside or local-vendor preference applies.

Scope covers three buildings totaling approximately 2,705 square feet. The Office Building (2,100 square feet) requires removal and disposal of fiberglass attic insulation and installation of open cell spray foam on the roof system and gables. Azalea Cottage (305 square feet) and Camellia Cottage (300 square feet) require removal of fiberglass insulation and backing board from crawl spaces, installation of closed cell spray foam on floor systems, and replacement of attic insulation with open cell spray foam. The specification sets required foam types and thicknesses for each area. The selected vendor must be licensed and insured, and no third-party subcontractors are permitted. The bid price must be all-inclusive, covering all labor, supplies, materials, and equipment for all three buildings.

Compliance requirements include E-Verify enrollment verification before award for suppliers employing Alabama workers, with documentation due within five calendar days of notification. Bids exceeding $25,000 require a completed Disclosure Statement, and competitively bid awards require its submission within ten days of award. Suppliers must certify Alabama sales and use tax compliance and must not boycott entities in jurisdictions with which Alabama maintains open trade.

The resulting contract may be renewed annually by written agreement, with a maximum total contract cost of $25,000 or five years from the effective date, whichever comes first. Price escalation may be considered for significant material, labor, or other component increases, provided documentation is supplied and increases do not exceed five percent of annual contract costs or relevant industry price indices. The State will evaluate bids on cost realism and price reasonableness.

Vendors wishing to conduct a site visit should contact John Trent at 334-850-1854.

Opportunity text

All or none** This is to remove current insulation and replace with new for 3 buildings @ Wehle Nature Center Located @ 4819 pleasant Drive, Midway AL 36053. ** SEE attached SPECS** for building size and requirements for each one If vendor wishes to do a site visit, please contact John Trent @ 334-850-1854

Files

File Type Posted
DOPQQBPV4.08.26.pdf PDF
SRC37502. Wehle insulation.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors