Connar Park CSO Offline Storage Tank Contract No. 1
- The state of Vermont, specifically through Washington County (FIPS Code 50023), is seeking a contractor for the NORTON STP CULV (118) infrastructure project located on VT Route 114. The procurement involves comprehensive culvert replacement and highway infrastructure improvement, commencing at station 300+50.00 (Mile Marker 5.691) and extending northerly 75.00 feet to station 301+25.00 (Mile Marker 5.705). Primary project deliverables include complete removal of an existing failing concrete...
- The Springfield Grove Street Culvert Replacement project is a public infrastructure procurement opportunity issued by Washington County, Vermont, focusing on critical culvert infrastructure replacement. The project specifically entails replacing an existing 48-inch diameter corrugated steel culvert with a new 60-inch corrugated steel culvert, including new steel end sections. The contract opportunity was publicly posted on November 3, 2025, with proposals due by December 3, 2025, indicating a...
- The Ascutney Fire District No. 2 is soliciting sealed bids for a comprehensive water system improvement project located in the Country Estate Mobile Home Park in Vermont. The procurement opportunity focuses on infrastructure enhancement, specifically involving the replacement of approximately 2,700 feet of existing water main and installation of 3,500 feet of new water service pipe. The project's key deliverables include the installation of new meter pits and final plumbing connections for...
- The Town of W. Corinth is seeking sealed bids for an infrastructure improvement project focusing on road and culvert rehabilitation. The procurement involves removing an existing 15" culvert and installing a new 18" culvert, with the culvert being provided by the Town. The project requires widening the roadway to a total width of 22 feet, excavating and shaping ditches 140 feet upstream and downstream from the culvert location, and stone-lining both the inlet and outlet of the culvert....
- The Massachusetts state and local contract opportunity involves the Rehabilitation of the New Boston Main Interceptor - Phase III, a critical infrastructure project located in Suffolk County. The procurement is seeking a qualified contractor to undertake comprehensive infrastructure rehabilitation with an estimated project cost of $30,620,606. The solicitation was posted on October 22, 2025, with proposal submissions due by November 18, 2025, indicating a procurement timeline of approximately...
The state of Vermont, specifically Washington County and Sheffield CDP, is seeking proposals for the Connar Park CSO Offline Storage Tank Contract No. 1, a critical infrastructure project focusing on the production and delivery of precast concrete box sections for a combined sewer overflow tank. This procurement opportunity was posted on November 3, 2025, with proposals due by November 21, 2025, indicating a relatively tight submission timeline. The primary objective of this contract is to acquire high-quality precast concrete components that will be integral to improving the local sewer infrastructure's capacity and performance. Vendors responding to this opportunity must demonstrate technical expertise in manufacturing precast concrete sections that meet specific engineering specifications for municipal infrastructure projects. Potential bidders should be prepared to provide detailed documentation of their manufacturing capabilities, material quality, and prior experience with similar municipal infrastructure contracts. While specific set-aside designations are not explicitly detailed in the provided information, contractors should anticipate potential local or state preferences for small, minority-owned, or disadvantaged business enterprises. The contract appears to be focused on a specialized infrastructure improvement project within Washington County, suggesting that vendors with demonstrated experience in municipal engineering and precast concrete manufacturing will be most competitive. Though the exact budget range is not specified, infrastructure projects of this nature typically represent significant municipal investments, potentially ranging from hundreds of thousands to several million dollars. Prospective bidders should be prepared to demonstrate financial stability, technical competence, and the capacity to deliver complex precast concrete components within the specified project parameters. Given the specialized nature of the work, contractors with prior experience in municipal sewer infrastructure and combined sewer overflow tank construction will likely have a competitive advantage in the bidding process.