Comer Elementary School Addition/Renovation - Low Voltage Data Cabling
Closed State & local contract opportunity Posted
- Solicitation number
- PE-55127-NONST-2026-000000015
- State
- Georgia
- Responses due
Opportunity facts
- NIGP codes
- 83826 Cabinets For Data, Frames, Runway, Cable Management, Raceway, Wire Mesh Or Basket Tray, Interduct (Telecom Closets)
- 83828 Cable, Copper (Cat. 5E 6 Etc) Including Interconnecting Components And Accessories (See Class 280 For Other Communications Cable)
- 83829 Cable, Fiber Optic W/Interconnecting Components And Accessories (See Class 280 For Other Communications Cable
- 83896 Wire And Cable, Telecommunication (Not Otherwise Specified)
- 96218 Cable Construction, Installation And Maintenance (Fiber Optic, Communication, Computer, Etc.)
- UNSPSC codes
- 26121657 Flame retardant fiber optic cable
- 43223321 Fiber optic connector clip
- 43223339 Fiber optic distribution box
- 72141116 Television cable laying service
- 43223326 Fiber optic patch cord
- 43223337 Fiber optic enclosure
- 43223310 Fiber optic connector
- 43223342 Waveguide and connection kit
- 72141117 Telephone and communication cable laying service
- 26121637 Outdoor fiber optics cable
Show all 29
- 26121655 Simplex and duplex fiber optic cable
- 41113717 Fiber optic test sources
- 41113716 Fiber optic fault locators
- 43223335 Fiber optic music wire
- 43223322 Fiber optic support grip
- 43223341 Combiner
- 72103302 Telecom equipment maintenance or support
- 72141115 Electrical cable laying service
- 26121650 Fiber optic cable assembly
- 26121656 Submarine fiber optic cable
- 43223311 Fiber optic attenuator
- 43223318 Fiber optic emitter
- 43223323 Fiber optic adapter
- 43223336 Fiber optic scope adapter
- 43223338 Fiber optic connection closure
- 43223340 Fiber optic fusion splicer
- 43223343 Network punchdown tool
- 72151602 Fiber optic cable installation service
- 72154005 Cable splicingservice
- Point of contact
-
- Amy Denman adenman@madison.k12.ga.us (706) 795-2191
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
Madison County School System is requesting proposals for low-voltage data cabling installation at Comer Elementary School Addition/Renovation in Danielsville, Georgia, with proposals due July 20, 2026 at 1:00 PM EST and written questions due July 10, 2026.
The scope covers structured cabling infrastructure comprising 281 total drops distributed across multiple systems: 68 access point drops, 61 camera drops, 88 data drops, 26 intercom drops, 18 clock drops, 7 outdoor horn drops, 9 door access control drops, and 4 Centegix system drops. The RFP specifies Cat6 Plenum cable, Siemon Z-Max jacks and faceplates, 24-port patch panels, color-coded patch cables, proper cable management using Velcro and J-hooks, and specific data closet racking configurations. Exhibit A contains drop and MDF locations that vendors must reference for scope development.
The project is divided into two phases: Phase 1 (cafeteria addition and six new classrooms with potential July 2026 start) and Phase 2 (renovation of existing office and old cafeteria, scheduled May 2027 through July 31, 2027). The contract term begins upon superintendent recommendation and concludes once the general contractor signs off on completed work.
Evaluation criteria carry the following weights: price (30 points), qualifications and scope of work (20 points), comprehensive integration (15 points), prior experience (15 points), references (10 points), and management capability (10 points). Madison County School System reserves the right to reject any proposals, accept proposals from multiple vendors, and award portions of the project as deemed in the school system's best interest. Bid evaluations will occur July 20–23, 2026, with vendor interviews possible July 21–23 and recommendation to superintendent by July 23. Prices must remain firm for one year from award date. Payment terms are Net 30 with monthly invoicing.
Opportunity text
It is the intention of Madison County Schools to contract with a vendor(s) to provide a high quality, cost- effective structured cabling system for this project. Please refer to EXHIBIT A (separate document) for drop and MDF locations. Included in this project are 68 access point drops, 61 camera drops, and 88 data drops, 26 intercom drops, 18 clock drops, 7 outdoor horn drops, 9 door access control drops, 4 Centegix system drops for 281 total.
Files
| File | Type | Posted |
|---|---|---|
| EXHIBIT A Comer Expansion LV.pdf | ||
| Comer Addition RFP _ Cabling.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity