Columbia County Bridges Paint and Steel Repairs

Open State & local contract opportunity Posted

Solicitation number
120888
State
Pennsylvania
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

PennDOT is soliciting bids for bridge preservation on five existing structures in Columbia County, Pennsylvania, with bids due December 10, 2026, when the bid package is scheduled for letting at 11:00 a.m. The project is a federally funded Standard Federal Project on a non-NHS state route and requires prequalification. The DBE compliance provision carries a 0% set-aside, and the contract includes Buy America, prevailing wage, and FAR and Executive Order 11246 certifications. Within seven calendar days of bid opening, the contractor must submit Worker Protection and Investment Certification (Form BOP-2201).

The work covers painting of the five structures, containment, disposal of bridge waste, fabricated structural steel repairs, rivet and weld replacements, flood debris removal, pavement markings, and other miscellaneous construction, as shown on the approved drawings for State Route 254, Section 060, and other state routes in various Columbia County townships. Structure work accounts for approximately 88% of the project. Bridge painting is limited to March 1 through November 30, detour timing is set for each bridge, and work is prohibited during local events, including the Bloomsburg Fair and other festivals. The contractor must maintain an emergency response plan with designated contacts and a one-hour maximum response time during non-working periods. Erosion and sediment control plans require approval from DEP and the County Conservation District.

The project cost range is $2.5 million to just under $5 million. Notice to proceed is anticipated January 25, 2027, with completion required by November 20, 2028, and no work may begin before April 5, 2027. Road User Liquidated Damages range from $1,000 to $15,000 per day, depending on milestone and detour completion dates; a milestone for SR 42-060 carries $1,000 per day if the bridge is not open after June 23, 2027. All addenda are posted electronically through ECMS.

Opportunity text

The description and location of the project are as follows: Bridge preservation including painting of five (5) existing structures, including containment, disposal of bridge waste, fabricated structural steel repairs, rivet and weld replacements, flood debris removal, pavement markings, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for State Route 254, Section 060, and other various state routes, in various townships, all in Columbia County.

Files

File Type Posted
854185padot120888.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors