Colonial Estates Phase 1
Closed State & local contract opportunity Posted
- Solicitation number
- PWST27001 Addendum 1
- State
- Texas
- Responses due
Opportunity facts
- Jurisdictions
- Point of contact
-
- Sabino Martin sabino.martin@arlingtontx.gov (817) 459-6582
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of Arlington Department of Public Works is requesting sealed bids for Colonial Estates Phase 1, a full-depth asphalt reclamation project affecting nine street segments in Arlington, Texas, with bids due October 6, 2026 at 2:00 p.m. and a pre-bid meeting/teleconference on September 21, 2026 at 2:00 p.m.
All bidders and subcontractors must be prequalified by the City of Arlington in asphalt paving; additional prequalification is required for miscellaneous concrete, sidewalk, and subgrade preparation work. Prevailing wage rates under the federal Davis-Bacon Act apply, ranging from $14.80 per hour (flaggers) to $36.10 per hour (electricians), effective May 18, 2026.
The scope encompasses full-depth asphalt reclamation on Colony Drive (Matlock Road to Minuteman Lane), Freedom Court, Freedom Lane, Gettysburg Drive, Liberty Trail, Minuteman Lane, Patriotic Court, Valley Forge Court, and Valley Forge Lane, along with sidewalk replacement, curb and gutter installation, concrete work, and landscaping. The project must be completed within 180 calendar days from the Notice to Proceed, with commencement anticipated approximately two months after bid opening.
The Engineer's estimate is $5 million. Bidders must submit a 5% bid security via certified check or approved bond. Performance, payment, and maintenance bonds equal to 100% of the contract price are required, with the maintenance bond covering two years following project acceptance. Signed prevailing wage affidavits and contractor residency statements must accompany the bid. Compliance with Title VI nondiscrimination requirements, Texas Government Code boycott and firearm industry discrimination prohibitions, and Texas Ethics Commission Form 1295 filing is mandatory. The City reserves the right to reject any or all bids and award to the lowest responsible bidder.
Opportunity text
The Department of Public Works has issued a bid opportunity. Please login to retrieve the documents. This project primarily consists of the full depth asphalt reclamation of the following streets: Colony Drive from Matlock Road to Minuteman Lane, Freedom Court from Freedom Lane to Cul-de-sac, Freedom Lane from Liberty Trail to Pilgrim Lane, Gettysburg Drive from Valley Forge Lane to E Sublett Road, Liberty Trail from Valley Forge Lane to Freedom Lane, Minuteman Lane from Freedom Lane to E Sublett Road, Patriotic Court from Valley Forge Lane to Cul-de-sac, Valley Forge Court from Valley Forge Lane to Cul-de-sac, and Valley Forge Lane from Liberty Trail to Minuteman Lane.
Files
| File | Type | Posted |
|---|---|---|
| Bid Specs - Colonial Estates Phase 1 PWST27001.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity